安全工作方法宣告 (SWMS) 生成器
選擇涉及的高風險建築工作,列出每個步驟及其危害和控制措施,並列印 SWMS 檔案供工人簽名.
在您的瀏覽器中執行。您的檔案不會離開裝置。 瞭解如何驗證
…
使用方法
- 1進入工作
輸入公司,地點,任務和主管.
- 2選擇HRCW
接收到三種高風險的建築工作.
- 3列表步驟
增加每一步及其危險,風險,控制措施以及責任人.
- 4Add PPE and review
Type the PPE and how controls will be checked.
- 5諮詢和簽署
讓他們簽名.
關於此工具
Before high risk construction work starts, the business doing it must prepare a safe work method statement (SWMS). The model WHS Regulations list 18 kinds of high risk construction work, including work where someone could fall more than two metres, work near energised electrical services, work in trenches deeper than 1.5 metres, work disturbing asbestos, and work where powered mobile plant moves around. A SWMS must identify the high risk work, the hazards and risks, the control measures, and how the controls will be put in place, monitored and reviewed. It must be written in a way workers can understand, given to the principal contractor, kept on site and reviewed when the work changes. This generator builds a SWMS from your job steps: each with its hazard, a risk rating, the controls and who is responsible, plus PPE, monitoring and a sign-off table for workers.
Who this is for
Subcontractors, small builders, trade businesses and sole traders doing high risk construction work, and principal contractors checking SWMS from their trades.
The 18 kinds of high risk construction work
They include risk of a fall of more than 2 metres; work on telecommunication towers; demolition of load-bearing elements; disturbing asbestos; structural alterations needing temporary support; confined spaces; shafts or trenches deeper than 1.5 metres and tunnels; explosives; pressurised gas mains; chemical, fuel or refrigerant lines; energised electrical installations; contaminated or flammable atmospheres; tilt-up or precast concrete; work next to roads, railways or shipping lanes; areas with powered mobile plant; artificial extremes of temperature; water or liquid with a drowning risk; and diving work.
Writing the steps
Break the job into steps in the order they happen. For each, list: - the hazard (what could cause harm), - the risk before controls (high, medium, low), - the control measures, following the hierarchy: eliminate, substitute, isolate, engineering controls, administrative controls, then PPE, - who is responsible. Be specific to the site. "Use edge protection" is weaker than "edge protection on all open edges before roof access, checked by the supervisor each morning".
Consultation and sign-off
Go through the SWMS with workers before work starts, and have each worker sign. New workers sign when they arrive. Workers must be able to read and understand it, so consider translations or pictures.
Keeping and reviewing
Keep the SWMS on site until the work is finished and for two years if there is a notifiable incident. Review it when the work changes, after an incident, or when a control does not work. If work is not being done in line with the SWMS, it must stop until the SWMS is reviewed.
Worked example
A roofing crew replacing a metal roof on a two-storey house identifies falls from height and powered mobile plant (a crane). Steps cover scaffold and edge protection, removing old sheets, crane lifts with an exclusion zone, and fixing new sheets, each with controls and a responsible person.
Limits
A template, not a substitute for a site-specific risk assessment. Your state's WHS laws apply.
計算示例
屋頂SWMS覆蓋 ⁇ 落和起重機升降,有四個階段和工人簽名.
要點
- 分類: 商業與工作
- 在瀏覽器中執行,無需註冊,無需上傳。
- 您輸入的資訊保留在裝置上。
- 提供英文版。
- 內容最後稽核日期:
- 官方來源: Model Work Health and Safety Regulations r 291 (18 kinds of high risk construction work) and r 299-303: a safe work method statement must identify the high risk construction work, the hazards and risks, the control measures and how they are implemented, monitored and reviewed, and be kept and reviewed on site
常見問題
什麼時候需要SWMS?
在任何18種高風險建築工程之前.
誰準備SWMS?
企業與其工人進行高風險建築工程.
需要簽名嗎?
工人應該簽名表明他們已經閱讀並理解.
我必須保持它多久?
工作完成後,以及可報案事件發生兩年之後.
什麼時候需要重新稽核?
當工作發生變化,事件發生後或控制器不正常時.
我的資料是否儲存?
只有在你的瀏覽器中.