安全工作方法声明 (SWMS) 生成器

选择涉及的高风险建筑工作,列出每个步骤及其危害和控制措施,并打印 SWMS 文件供工人签名.

在您的浏览器中运行。您的文件不会离开设备。 了解如何验证

…

使用方法

  1. 1
    进入工作

    输入公司,地点,任务和主管.

  2. 2
    选择HRCW

    接收到三种高风险的建筑工作.

  3. 3
    列表步骤

    增加每一步及其危险,风险,控制措施以及责任人.

  4. 4
    Add PPE and review

    Type the PPE and how controls will be checked.

  5. 5
    咨询和签署

    让他们签名.

关于此工具

Before high risk construction work starts, the business doing it must prepare a safe work method statement (SWMS). The model WHS Regulations list 18 kinds of high risk construction work, including work where someone could fall more than two metres, work near energised electrical services, work in trenches deeper than 1.5 metres, work disturbing asbestos, and work where powered mobile plant moves around. A SWMS must identify the high risk work, the hazards and risks, the control measures, and how the controls will be put in place, monitored and reviewed. It must be written in a way workers can understand, given to the principal contractor, kept on site and reviewed when the work changes. This generator builds a SWMS from your job steps: each with its hazard, a risk rating, the controls and who is responsible, plus PPE, monitoring and a sign-off table for workers.

Who this is for

Subcontractors, small builders, trade businesses and sole traders doing high risk construction work, and principal contractors checking SWMS from their trades.

The 18 kinds of high risk construction work

They include risk of a fall of more than 2 metres; work on telecommunication towers; demolition of load-bearing elements; disturbing asbestos; structural alterations needing temporary support; confined spaces; shafts or trenches deeper than 1.5 metres and tunnels; explosives; pressurised gas mains; chemical, fuel or refrigerant lines; energised electrical installations; contaminated or flammable atmospheres; tilt-up or precast concrete; work next to roads, railways or shipping lanes; areas with powered mobile plant; artificial extremes of temperature; water or liquid with a drowning risk; and diving work.

Writing the steps

Break the job into steps in the order they happen. For each, list: - the hazard (what could cause harm), - the risk before controls (high, medium, low), - the control measures, following the hierarchy: eliminate, substitute, isolate, engineering controls, administrative controls, then PPE, - who is responsible. Be specific to the site. "Use edge protection" is weaker than "edge protection on all open edges before roof access, checked by the supervisor each morning".

Consultation and sign-off

Go through the SWMS with workers before work starts, and have each worker sign. New workers sign when they arrive. Workers must be able to read and understand it, so consider translations or pictures.

Keeping and reviewing

Keep the SWMS on site until the work is finished and for two years if there is a notifiable incident. Review it when the work changes, after an incident, or when a control does not work. If work is not being done in line with the SWMS, it must stop until the SWMS is reviewed.

Worked example

A roofing crew replacing a metal roof on a two-storey house identifies falls from height and powered mobile plant (a crane). Steps cover scaffold and edge protection, removing old sheets, crane lifts with an exclusion zone, and fixing new sheets, each with controls and a responsible person.

Limits

A template, not a substitute for a site-specific risk assessment. Your state's WHS laws apply.

计算示例

屋顶SWMS覆盖 ⁇ 落和起重机升降,有四个阶段和工人签名.

要点

常见问题

什么时候需要SWMS?

在任何18种高风险建筑工程之前.

谁准备SWMS?

企业与其工人进行高风险建筑工程.

需要签名吗?

工人应该签名表明他们已经阅读并理解.

我必须保持它多久?

工作完成后,以及可报案事件发生两年之后.

什么时候需要重新审核?

当工作发生变化,事件发生后或控制器不正常时.

我的数据是否存储?

只有在你的浏览器中.

完全免费无费用,无需注册
文件保持私密一切都在您的浏览器中运行
用您的语言轻松使用提供多种语言