Nurse Staffing and HPPD Calculator

List units with census, target HPPD and patients per RN, set the shift pattern and skill mix, and see target and planned hours, a shift grid with RNs and other staff, productive and paid FTEs, actual HPPD and the yearly cost.

ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ

…

วิธีทำ

  1. 1
    Add units

    Census, target HPPD and ratio.

  2. 2
    Set shifts

    Hours and share of the day.

  3. 3
    Skill mix

    RN share of hours.

  4. 4
    FTE settings

    2,080 hours and non-productive time.

  5. 5
    Read the grid

    RNs and other staff per shift.

  6. 6
    Export

    CSV grid and unit summary.

เกี่ยวกับเครื่องมือนี้

Nurse managers and staffing offices plan with two numbers that do not always agree: hours per patient day, the budget measure, and patient-to-nurse ratios, the safety floor. This calculator works with both at once. Each unit row holds the average daily census, a target HPPD, the number of patients per RN and, if you have it, the actual productive hours worked per day. The target hours are census times HPPD. The shift grid splits those hours across the shifts you define, for example two 12-hour shifts with 55% of the hours on days, or three 8-hour shifts. For each shift the RN count is the larger of two figures: the ratio count, which is the census divided by patients per RN and rounded up, and the RN share of that shift's hours divided by the shift length, also rounded up. Other staff such as LPNs, CNAs or techs cover the remaining hours. Because staff come in whole people, the planned hours are usually a little above the target, and the planned HPPD shows by how much. FTEs are the planned yearly hours divided by the hours in one FTE, 2,080 by default, and paid FTEs gross that up for non-productive time such as vacation, sick time, education and orientation, which you set as an example percentage. An average paid hourly cost turns the result into a yearly staffing budget. The ratios are editable examples modelled on California Title 22 minimums, and the table of unit types shows them for reference. Charts compare paid and productive FTEs by unit, and the grid and unit summaries download as CSV.

Who this is for

Nurse managers building a budget or a core schedule, directors comparing units, staffing coordinators, nursing administration students and union or staffing committee members who want to check a proposed grid against ratios.

HPPD in plain terms

Hours per patient day is the productive nursing hours worked in a day divided by the number of patients. A unit with 28 patients and 236 productive hours ran at about 8.4 HPPD. Some organisations count only direct care staff, so use the same definition for the target and the actual.

Ratios and why they win

A ratio is a floor for each shift. If the HPPD budget would give fewer RNs than the ratio needs, the ratio wins and the planned hours rise. If HPPD gives more, for example on a high-acuity unit, the hours win. The grid shows both counts side by side.

FTEs and non-productive time

One FTE is usually 2,080 paid hours a year, but not all of those hours are on the unit. If 12% of paid time is leave and education, you need about 1.14 paid FTEs for each productive FTE. Change the figure to your organisation's actual rate.

Shift patterns

Twelve-hour units usually staff days a little heavier than nights. Eight-hour units have day, evening and night shares. The tool warns if the shares do not add to 100% or the shift hours do not add to 24.

Using the actual hours

Enter the actual productive hours per day from your payroll or productivity report. The page shows the actual HPPD beside the target and flags any unit running more than 5% below its target.

Limits

A planning aid, not a staffing standard or legal advice. Ratios and rules differ by state, contract and unit, and census changes hour by hour. Acuity, admissions, discharges, breaks and float coverage need judgement from nursing leadership.

ตัวอย่างพร้อมวิธีทำ

The default hospital has three units with a total census of 62: a medical-surgical unit of 28 at 8.5 HPPD and 1:5, an ICU of 12 at 18 HPPD and 1:2, and telemetry of 22 at 9.5 HPPD and 1:4. Target hours are 663 a day and planned hours 684, a planned HPPD of 11.03. That needs 120.0 productive FTEs, or 136.4 paid FTEs with 12% non-productive time, costing about $16.5 million a year at $58 an hour.

สรุปสั้น ๆ

คำถามที่พบบ่อย

How is HPPD calculated?

Productive nursing hours divided by patient days, or by the average census for one day.

How many hours are in one FTE?

Usually 2,080 a year (40 hours times 52 weeks); you can change it.

Which state has fixed nurse ratios?

California sets minimum ratios by unit type in Title 22; most states do not.

Why are planned hours higher than target hours?

Staff are counted in whole people per shift and ratios can require more RNs.

What is non-productive time?

Paid hours not worked on the unit, such as vacation, sick leave, education and orientation.

Can I use 8-hour shifts?

Yes. Edit the shift grid rows with hours and the share of the day's hours.

ฟรีทั้งหมดไม่มีค่าใช้จ่าย ไม่ต้องสมัคร
ไฟล์เป็นส่วนตัวทุกอย่างทำงานในเบราว์เซอร์ของคุณ
ใช้ง่ายในภาษาของคุณมีหลายภาษา