Value Stream Map Maker
Enter customer demand and working time, add process steps with cycle time, changeover, uptime, operators and scrap and the stock waiting before each, and get a value stream map with inventory triangles, information flow, a timeline ladder, takt time, lead time, process cycle efficiency and a current versus future state comparison.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1Demand
Enter demand, days and working time.
- 2Steps
Add each process with its data.
- 3Stock
Enter inventory before every step.
- 4Read
Check takt, lead time and PCE.
- 5Future
Copy and improve the future state.
เกี่ยวกับเครื่องมือนี้
The Value Stream Map Maker draws the lean map of how one product family moves from supplier to customer and does the arithmetic that usually sits in pencil under the timeline. Demand is entered as pieces per period with the number of working days in that period, and working time as shifts per day, hours per shift and break minutes per shift. Available time per day is shifts multiplied by the hours per shift less breaks, in seconds, and daily demand is the period demand divided by the working days. Takt time is available time divided by daily demand. Each process step has a name, the stock waiting before it in pieces, cycle time and changeover in seconds, uptime, operators and scrap. Inventory is turned into days by dividing pieces by daily demand. Lead time adds those days for every triangle, including finished goods before shipping, plus the total cycle time expressed in working days. Value-added time is the sum of the cycle times, and process cycle efficiency is value-added time divided by lead time. Rolled throughput yield multiplies the share of good pieces at each step. The bottleneck is the step with the longest cycle time per operator, and a step is flagged as over takt when its cycle time, divided by uptime and by operators, is longer than takt. The map shows supplier and customer icons, a production control box with your information flow, dashed push arrows, inventory triangles with piece counts, process boxes with their data, and the timeline ladder with waiting days above and cycle times below.
Who this is for
Lean practitioners and continuous improvement engineers running a value stream walk, production and operations managers preparing a kaizen event, consultants presenting current and future state maps, and students of lean manufacturing who want to check their takt and lead time sums.
How to use it
1. Enter the product family, demand per period and working days. 2. Enter shifts, hours per shift and break minutes. 3. Add each process step with its cycle time, uptime, operators, scrap and inventory before it. 4. Read takt, lead time, value-added time, PCE and the bottleneck. 5. Copy the current state into the future state and change it to test ideas.
What the sample shows
The sample is a steering bracket made in left and right versions, with demand of 18,400 pieces over 20 days, so 920 a day. Two shifts of 8 hours with 30 minutes of breaks give 54,000 seconds a day and a takt time of 58.7 seconds. The current state has five steps, Stamping, two welding stations and two assembly stations. Its triangles hold 5.4, 5.0, 1.2, 1.7 and 1.3 days of stock, plus 2.9 days of finished goods, for a lead time of 17.6 days against only 188 seconds of value-added time, a PCE of 0.020 percent. Assembly 1, at 62 seconds, is the bottleneck and is slower than takt. The future state merges the welders and the assemblers into two-person cells and cuts stock, bringing lead time down to 3.6 days, PCE up to 0.051 percent and rolled throughput yield from 96.5 to 98.0 percent.
Current and future state
Each state keeps its own steps, inventories and settings, and the lead time card on one tab shows the figure for the other one. The future tab has a button that copies the current state over it, so you can start the improved map from the real one.
Exports and saving
The map downloads as PNG, SVG, a widescreen PowerPoint slide or a print page for PDF, and the step table, with waiting days and cycle time per operator against takt, downloads as CSV, XLSX or JSON. Work is autosaved in this browser with Undo, Redo, named saves and JSON files.
Limits
Changeover time is shown in the data boxes but not used in any calculation, and uptime stretches the cycle time used for both the over-takt check and the bottleneck choice. There is no scheduling, batch sizing, kanban sizing or simulation; the figures are a static snapshot built from the numbers you enter. The delivery note next to the truck is a free text field. A value stream map is a lean analysis aid and is not engineering, operations or investment advice; confirm the timings on the floor before acting on them.
ตัวอย่างพร้อมวิธีทำ
Steering bracket sample: takt 58.7 s from 920 pieces a day; current lead time 17.6 days with 188 s value-added (PCE 0.020%), future state 3.6 days.
สรุปสั้น ๆ
- หมวดหมู่: ธุรกิจและการทำงาน
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: Lean value stream mapping (Rother and Shook, Learning to See): takt time, lead time, process cycle efficiency
คำถามที่พบบ่อย
How is takt time calculated?
Takt time is available working time per day divided by daily customer demand. Available time is shifts times hours per shift less breaks, and daily demand is period demand divided by working days.
How are inventory triangles turned into days?
The pieces in each triangle are divided by daily demand. In the sample, 4,600 pieces before Welding 1 divided by 920 a day is 5.0 days of waiting.
What is process cycle efficiency?
It is value-added time divided by total lead time, shown as a percentage. Values well under 1 percent are common in batch-and-queue plants, which is what the map is meant to reveal.
Why is a step outlined in red?
Its cycle time, adjusted for uptime and divided by the number of operators, is longer than takt time, so it cannot keep up with demand at that pace.
Can I compare current and future state maps?
Yes. Switch between the two tabs, each with its own steps and stock. The lead time card on each tab also shows the other state's lead time.
Does the tool schedule production or size kanbans?
No. It calculates takt, lead time, value-added time, PCE, yield and the bottleneck from your figures and draws the map. Scheduling and kanban sizing need separate tools.