Time Study and Work Measurement Sheet with Stopwatch
Break a job into elements, time cycles with the on-screen stopwatch or type readings, rate the pace, add relaxation allowances and get the standard time per unit, output per hour and per shift, and how many more cycles to time.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1Describe the study
Enter the operation, operator, date and conditions, and choose snapback or continuous timing.
- 2List the elements
Name each element with a clear end point, its type, frequency and rating.
- 3Time the cycles
Press Start, then tap the big button or Space at the end of each element.
- 4Clean the readings
Exclude abnormal readings by hand or set an automatic limit.
- 5Set allowances
Replace the example allowances with your agreed percentages.
- 6Use the results
Read standard time and output, check the cycles needed, then export CSV or print.
เกี่ยวกับเครื่องมือนี้
Time study is the classic work measurement technique for setting the time a qualified worker needs to do a job at a defined level of performance. The job is broken into elements with clear break points, such as "pick up part and place in jig" or "drill hole", and each element is timed over several cycles. Because people work at different speeds, the observer also rates the pace of each element against a standard, so that a fast operator's times are scaled up and a slow operator's scaled down. Allowances for personal needs, fatigue and unavoidable delays are then added to give the standard time. This sheet puts all of that on one screen. Define the elements with their type (repetitive, occasional or machine-controlled), how often each occurs per unit, and a rating on the BS 100 scale. Time the cycles with the large stopwatch button, which works with a tap or the space bar and supports both snapback and continuous timing, or type readings in seconds, decimal minutes or centiminutes. Abnormal readings can be excluded by hand or automatically when they stray too far from the element median. The results give basic time, standard time, time per unit with frequencies applied, output per hour and per shift, the coefficient of variation of each element, and the number of cycles needed for your accuracy target.
How the standard time is built
Observed time for an element is the mean of the readings you keep. Basic time is observed time × rating ÷ 100, so an element done at rating 110 in 8.0 seconds has a basic time of 8.8 seconds. Standard time adds the allowances: by default as a percentage of basic time, the British and ILO convention, or optionally as a share of the working day. Occasional elements are multiplied by their frequency, so a 42-second box change every ten parts adds 4.2 seconds of basic time to each part. Machine-controlled elements are rated at 100 and, unless you choose otherwise, get no relaxation allowance because the operator is not working during them. The sample size follows the Niebel formula, n′ = (40 √(nΣx² − (Σx)²) ÷ Σx)², for 95% confidence and ±5% accuracy, alongside a t-based estimate.
Worked example
The sample studies a bench drilling job in four elements over six snapback cycles. Placing the part reads 6.2, 5.8, 6.5, 6.0, 9.6 and 6.1 seconds; the 9.6 is more than 25% above the median and is excluded, leaving a mean of 6.12 s. At rating 100 and 14% allowances the standard time is 6.98 s. Drilling averages 11.95 s, rated 90, for a basic time of 10.76 s with no allowance as a machine element. Removing and stacking averages 7.97 s at rating 110, giving 8.76 s basic and 9.99 s standard. The box change was timed once at 42 s, standard 47.88 s, and happens once in ten parts, adding 4.79 s per part. The standard time per part is 32.51 s, or 110.7 parts per hour and 830 parts in a 450-minute shift.
Limits
A time study measures one method under the conditions you record; if the method, tooling or material changes, the standard is no longer valid. Ratings are judgements and need trained observers. The allowance percentages supplied are examples in the style of the ILO tables, not agreed figures, and must be replaced with your own. Always tell the operator they are being studied; the result is not a verdict on any person.
ตัวอย่างพร้อมวิธีทำ
Bench drilling, 4 elements, 6 cycles: standard time 32.51 s per part, 110.7 parts per hour, 830 per 450-minute shift.
สรุปสั้น ๆ
- หมวดหมู่: ธุรกิจและการทำงาน
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: ILO, Introduction to Work Study, 4th edition (1992)
คำถามที่พบบ่อย
What is the difference between snapback and continuous timing?
With snapback the watch returns to zero at the end of each element, so every reading is one element's time. With continuous timing the watch runs throughout and you note the total at each break point; the tool subtracts readings to get element times, which avoids losing time between elements.
How do ratings work?
On the BS 100 scale, 100 is standard performance: the pace a qualified, motivated worker can keep up over a shift. A rating of 90 means slower than standard and 120 faster. Basic time equals observed time × rating ÷ 100. You can rate each element, or switch on rating every reading.
Which allowances should I use?
Use the relaxation and contingency allowances agreed in your organisation. The built-in table shows example values in the style of the ILO tables, such as 5% for personal needs and 4% basic fatigue, so you can see how they work, but they are not official figures.
How many cycles should I time?
It depends on how variable the element is. The tool shows the Niebel estimate for 95% confidence and ±5% accuracy and a t-based estimate for your chosen confidence and accuracy, and warns when the largest element needs more cycles than you have recorded.
Can I use it on a phone at the workstation?
Yes. The stopwatch button is large enough to tap without looking closely, the readings are kept in the browser as you go, and the sheet scrolls sideways inside its own box on a small screen.
How do I record an occasional element?
Give it a frequency such as 1/10 and time it only in the cycles where it happens; press Skip element in the others. Its standard time is multiplied by the frequency in the per-unit total.