Preventive Maintenance Checklist Builder
List assets and their daily to yearly tasks, print tick sheets with a QR code per asset, log what was done and see overdue work, compliance and planned hours.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1Add assets
In Assets and tasks, add each asset with a tag, name, location and make.
- 2Add tasks
Add tasks per asset with frequency, first due date, minutes, who does them and the critical flag.
- 3Check the due list
Open Due list, set the as-of date and work from the most overdue task down.
- 4Log completions
Tap Done on a task, or add rows in Log with initials, notes and a fault flag.
- 5Print sheets
In Checklist sheets choose the asset, week or month and frequencies, then print or save.
- 6Review compliance
Open Compliance for the three-month rate per asset and the planned hours chart.
เกี่ยวกับเครื่องมือนี้
Preventive maintenance works when the right check happens at the right interval and someone can prove it did. Paper tick sheets on the machine still do that job well in many plants, workshops and buildings, as long as they are complete and current. This builder produces those sheets from one list. Add assets with a tag, name, location and make, then add tasks for each asset with a frequency (daily, weekly, monthly, quarterly, every six months or yearly), the first due date, the minutes it takes, who does it and whether it is safety-critical. The due list shows every task with its last completion, next due date and status, sorted with the most overdue at the top. One tap on Done logs a completion with your initials, and the next due date moves one interval forward from that date. Sheets can cover a week (Monday to Sunday) or a calendar month and show a tick box on each day a task falls due, so a daily check gets a box every day and a weekly one gets a box on its day.
QR asset tags
Each sheet carries a QR code with the asset tag, name, location and site as plain text. Any phone camera reads it, which helps confirm the operator is at the right machine and lets you stick the same code on the asset. Sheets print one asset per page with lines for faults found and signatures, and can also be saved as an HTML file.
Log, compliance and workload
The log lists every completion with date, initials, notes and an OK or fault flag. The compliance view compares scheduled occurrences in the last three months with logged completions per asset, allowing a day of grace, and colours each rate. A stacked chart shows planned hours per month for the next year by skill, such as operator, technician or vendor, which helps plan staffing and contractor visits.
Limits
Frequencies are calendar-based; meter-based tasks (every 500 running hours) are not modelled, so convert them to an expected calendar interval. Daily tasks only count as done when logged. Follow the manufacturer's manual and your local regulations for what must be inspected; the tool organises the work but does not set the requirements.
ตัวอย่างพร้อมวิธีทำ
A utilities area has three assets: an air compressor, an air handling unit and an electric forklift, with seven tasks. On 3 November 2026 the yearly compressor service (first due 20 November 2025, never logged) is the most overdue item, followed by the quarterly filter change (last done 2 July, due 2 October) and the six-monthly coil clean (due 12 October). The daily compressor check was done yesterday and is due today. The monthly intake filter clean, done on 16 October, is next due on 16 November. With weekends skipped, the weekly sheet for 2 to 8 November shows five tick boxes for each daily task and one for the weekly battery check.
สรุปสั้น ๆ
- หมวดหมู่: ธุรกิจและการทำงาน
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: ISO 55000 asset management overview and OSHA powered industrial truck daily examination (29 CFR 1910.178(q)(7))
คำถามที่พบบ่อย
How is the next due date set?
One interval after the last logged completion, or the first due date if the task was never done. Monthly intervals keep the same day of the month and fall back to the last day in shorter months.
Can daily checks skip weekends?
Yes. Tick Skip weekends for daily tasks in Assets and tasks; sheets and compliance then ignore Saturdays and Sundays for daily tasks only.
What is in the QR code?
Plain text with the asset tag, name, location and site. It does not link to a website, so it works offline and reveals nothing beyond what is printed beside it.
How is compliance calculated?
For each scheduled occurrence in the last three months, the tool looks for a completion logged within that occurrence's interval, with one day of grace. Done occurrences divided by scheduled ones give the rate.
Can several people use it?
Data is stored in this browser. Share the JSON file or printed sheets with the team; completions logged on paper can be entered later from the sheets.
Does it replace a CMMS?
Not fully. It covers checklists, due dates, logs and printable sheets for a small site, but it has no work-order approval, spare-parts stock or multi-user access.