Permitted Development Extension Size Checker
Choose the house type, whether it is on designated land, and the work, enter the depth, height, eaves, distance to boundaries, side width, loft volume and garden coverage, and see each permitted development rule, whether it is met, and whether you are likely to need permission.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1House
Choose house type and land.
- 2Work
Choose the work.
- 3Sizes
Enter the measurements.
- 4Check
Read each rule.
- 5Next
Get a certificate or permission.
เกี่ยวกับเครื่องมือนี้
Many home extensions in England can be built without applying for planning permission, under permitted development rights set by the General Permitted Development Order. Class A covers extensions and Class B loft conversions that add to the roof. The rights come with limits. A single-storey rear extension can extend up to 4 metres beyond the original rear wall of a detached house, or 3 metres for other houses, and up to double that, 8 or 6 metres, through the larger home extension prior approval process, in which neighbours are consulted. It can be up to 4 metres high, and if it is within 2 metres of a boundary, the eaves can be no higher than 3 metres. A two-storey rear extension can go up to 3 metres deep and must be at least 7 metres from the rear boundary. A side extension must be single storey, up to 4 metres high and no wider than half the width of the original house. Loft conversions can add up to 40 cubic metres of roof space on terraced houses and 50 cubic metres on others, with no dormer on the roof slope facing the highway. Extensions and other buildings cannot cover more than half the garden. On designated land, such as conservation areas, national parks and areas of outstanding natural beauty, side and two-storey extensions and roof additions are not permitted development. Flats, maisonettes and listed buildings have no such rights, and councils can remove rights with Article 4 directions. This checker tests your plans against the main limits. Choose the house type and work, enter the measurements, and see each rule and whether you are likely to need permission.
Main limits
| Work | Limit | |---|---| | Single-storey rear | 4 m detached, 3 m others (8 m / 6 m with prior approval), 4 m high | | Near boundary (within 2 m) | Eaves up to 3 m | | Two-storey rear | 3 m deep, 7 m from the rear boundary | | Side | Single storey, 4 m high, half the house width | | Loft | 40 m³ terraced, 50 m³ others, no front dormer | | Garden | Buildings cover no more than half |
Worked example
A semi-detached house plans a 3 m single-storey rear extension, 3.8 m high with 2.9 m eaves, 1 m from the boundary, covering 30% of the garden: within the limits. A 38 m³ rear dormer on a terraced house is also within the 40 m³ limit. A 5 m rear extension on the semi would need prior approval.
Certainty
Apply for a lawful development certificate to prove the work is permitted development.
Building regulations
Permitted development is about planning only; the work still needs building regulations approval and, near a shared wall, party wall notices.
Privacy
Your data stays in your browser.
Limits
A guide to the main limits; check the Planning Portal and your council. Not legal advice.
ตัวอย่างพร้อมวิธีทำ
3 m rear extension on a semi, 3.8 m high, eaves 2.9 m → within the main limits.
สรุปสั้น ๆ
- หมวดหมู่: บ้านและการใช้ชีวิต
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: Permitted development rights for householders: technical guidance
คำถามที่พบบ่อย
How far can I extend without planning permission?
3 m (4 m detached) for a single-storey rear extension, more with prior approval.
How big can a loft conversion be?
40 m³ on terraced houses, 50 m³ on others.
Can I build a side extension under PD?
Yes, single storey and no wider than half the house, except on designated land.
Do flats have permitted development rights?
No, flats and maisonettes need permission.
How can I be sure?
Apply for a lawful development certificate.
Is my data uploaded?
No.
