Ladder and Scaffold Inspection Register

Record each inspection of a ladder, stepladder, mobile tower or scaffold with its tag number, location, inspector and faults found, mark it pass, pass with actions or fail, add photos, see the next inspection date from your intervals, and print an inspection tag or an inventory report.

ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ

…

วิธีทำ

  1. 1
    Intervals

    Set the site and inspection intervals.

  2. 2
    Tag

    Give each item a tag number and type.

  3. 3
    Inspect

    Tick faults and choose the result.

  4. 4
    Photos

    Add photos and notes for faults.

  5. 5
    Print

    Print the tag and the inventory report.

เกี่ยวกับเครื่องมือนี้

The Ladder and Scaffold Inspection Register keeps one record of every inspection carried out on access equipment on a site or in a building. Each inspection line holds the tag or asset number, the type of equipment, the location, the date, the inspector, the faults found, the result, photos and notes. Seven types are listed: leaning ladder, stepladder, extension ladder, platform steps, mobile tower, tube and fitting scaffold and system scaffold. The faults list covers the common reasons to take equipment out of use, from bent or split stiles, damaged rungs and worn feet to faulty locking bars, missing labels, faulty base plates or castors, missing bracing, guardrails or toe boards, damaged platform boards, missing ties and equipment that is not level or plumb. Results are Pass, Pass with actions, or Fail - remove from use. The next inspection date is worked out from two intervals in the settings: one for ladders and steps, which starts at 90 days, and one for towers and scaffolds, which starts at 7 days. Under the Work at Height Regulations 2005, a scaffold must be inspected at intervals of no more than seven days and after anything that could affect its stability, such as bad weather. The register works on the latest inspection of each tag, so stat cards, the inspections due list and the inventory count each item once. A printable inspection tag shows SAFE FOR USE in green or DO NOT USE in red with the next inspection date.

Who this is for

Site managers and supervisors, facilities and maintenance managers who look after ladders in a building, scaffold inspectors, tower erectors and health and safety advisers who audit access equipment.

How to use it

1. Set the site and the re-inspection intervals for ladders and for towers and scaffolds. 2. Give every item a tag number and record its type and location. 3. Inspect it, tick any faults and choose the result. 4. Add photos and notes for faults and actions. 5. Print a tag for the item and the inventory report for your records.

What the sample shows

Four items are on the sample site, Riverside Apartments Block B. Stepladder L-001 in the store room passed on 1 September, so with a 90-day interval it is due again on 30 November. Leaning ladder L-002 on level 2 failed on 28 October with worn feet and has been quarantined, and the insights panel tells you to keep it out of use until it is repaired or scrapped. Mobile tower T-01 in the lobby passed on 3 November and, on the 7-day interval, is due on 10 November. System scaffold S-01 on the east elevation passed with actions on 2 November after a missing toe board was refitted at lift 3, so it is due on 9 November. The stat cards read 4 items, 1 failed or out of use and 4 inspections logged.

Due dates and overdue items

The Inspections due tab lists the next date for every item that has not failed, sorted by date, and can export them to your calendar. Items whose next date has passed are flagged OVERDUE in the table and counted on the stat cards, and failed items drop off the due list because they should not be used until they are repaired.

Inventory report

The Summary tab groups the latest inspection of each item by type, with the number of items and how many passed. Each group prints an inventory report with tag, location, last inspection, result and next due date.

Limits

The intervals are settings: 7 days for scaffolds follows the Work at Height Regulations, while ladder intervals depend on how and where they are used, so set them from your own risk assessment. Inspections must still be done by a competent person, and scaffolds also need inspection after installation and after events such as high winds. Records stay in this browser. This register is not legal or safety advice.

ตัวอย่างพร้อมวิธีทำ

Riverside sample: L-002 failed (worn feet), T-01 tower passed 3 November and is due 10 November, scaffold S-01 passed with actions and is due 9 November.

สรุปสั้น ๆ

คำถามที่พบบ่อย

How often must a scaffold be inspected?

Under the Work at Height Regulations 2005, after installation, at intervals not exceeding seven days, and after any event likely to affect its strength or stability.

How often should ladders be inspected?

Users should check a ladder before each use, and a detailed inspection should be done and recorded at intervals set by your risk assessment. The register starts with 90 days, which you can change.

Why does a failed ladder not appear in the due list?

A failed item should not be used, so there is no next inspection to plan. Once it is repaired, record a new inspection and it returns to the list.

What does the inspection tag show?

SAFE FOR USE in green or DO NOT USE in red, the tag number and type, the inspection date and inspector, and the next inspection date in bold.

Does each inspection count as a new item?

No. The register uses the latest inspection for each tag number for its counts and inventory, while every inspection stays in the log as history.

Can I record scaffold handover certificates?

You can log the handover inspection as a normal inspection with notes, but keep the scaffolder's handover certificate itself in your site files.