Field Site Generator and Power Planner

Enter each piece of equipment with watts, quantity, phase, duty and starting surge, and get a kVA size, set loading, phase balance and daily diesel.

ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ

…

วิธีทำ

  1. 1
    Set basics

    Power factor, margin, fuel rate.

  2. 2
    List loads

    Watts, quantity, phase.

  3. 3
    Add duty

    And starting surge.

  4. 4
    Read size

    kVA, loading, litres a day.

  5. 5
    Balance

    Move loads between phases.

เกี่ยวกับเครื่องมือนี้

The Field Site Generator and Power Planner turns a list of equipment into a first estimate of the generator a tent site, exercise headquarters or relief base will need. Each row holds a name, the watts drawn by one unit, how many there are, which phase it sits on (A, B or C), a duty percentage for how much of the day it is actually running, and a starting surge multiplier for motors and compressors. From that list the planner works out the connected load, the average load across the day, the largest single starting surge and a size in kVA, then picks the next standard rating from a ladder of 5, 7.5, 10, 15, 20, 30, 45, 60, 80, 100, 150 and 200 kVA. It also reports how hard the chosen set will actually be working, how many litres of diesel a day the average load should burn, and, on a three-phase supply, how evenly the load is spread across the three phases, with a bar chart per phase. You can keep several sites or options side by side, compare them, and print or export the plan.

Who this is for

Quartermasters and logistics officers drawing up a field headquarters or exercise camp, site managers on relief bases and remote project camps, event and expedition planners hiring a temporary set, and students learning why generator size is not simply the sum of the light bulbs.

How to use it

1. Open the Generator group and set the power factor (0.8 by default), the sizing margin (25%), the diesel use per kWh (0.3 L) and whether the supply is single-phase or three-phase. 2. In the Loads table, edit or replace the six example rows: lighting, laptops and screens, two fridges, three air conditioners, two kettles or urns and a radio or IT rack. 3. For each row, type the watts for one unit and the quantity, choose the phase, and enter a duty percentage, such as 50 for lights that are on half the day. 4. Set the starting surge multiplier: 1 for resistive loads such as kettles and lamps, about 3 for fridges, compressors and air conditioners. 5. Read the recommended size, the load on that set and the fuel per day, then check the phase chart and the note under it. 6. Add a second option with + power plan, for example a site without air conditioning, and compare the two. 7. Print the report or export the comparison as CSV.

How the size is worked out

The connected load is watts times quantity summed over every row. The starting allowance is the biggest single surge in the list, taken as one unit's watts multiplied by its surge factor minus one, on the basis that motors do not all start at the same instant. Connected load plus that surge, divided by the power factor and increased by the margin, gives the required kVA. With the default list, the connected load is 17.2 kW, the largest surge comes from one air conditioner at 2,000 W times 2, or 4 kW, and 21.2 kW divided by 0.8 and increased by 25% gives about 33.1 kVA, so the planner recommends a 45 kVA set. Above 200 kVA it simply rounds the figure up.

Average load, set loading and fuel

Each row's connected watts are multiplied by its duty percentage to give an average load, which is 8.63 kW for the example. That figure drives two results. Fuel per day is the average kW times 24 hours times the litres per kWh, about 62 L for the example. Load on the recommended set is the average kW divided by the set's kVA times the power factor, about 24% here. Diesel sets prefer to run above roughly 30 to 40% of their rating, and long periods at light load lead to wet stacking, so a low figure is a hint to look at two smaller sets or a different mix.

Phase balance

On a three-phase supply the planner totals the connected load on phases A, B and C and expresses the gap between the heaviest and lightest as a percentage of the heaviest. The example is deliberately lopsided, with 8.4 kW on A, 7.4 kW on B and only 1.4 kW on C, an imbalance of about 83%. Anything over 20% brings a note asking you to move equipment between phases. On a single-phase supply the phase column and chart are dropped.

Comparing options

The second built-in example strips out the air conditioners and kettles, leaving lighting, IT and the radio rack. Its connected load falls to 5.6 kW, the required size to about 8.8 kVA and the recommendation to 10 kVA, with the set running at about 43% of its rating and burning roughly 25 L a day. Seeing both columns together shows how much one comfort item can drive the whole power plan.

Limits

The figures are rough planning numbers from nameplate watts and your own duty guesses, not a load study. Real starting currents, harmonics from IT and LED drivers, altitude and heat derating, cable runs and fault protection are all outside its scope. Installation, earthing, RCD protection and the final choice of set belong to a competent electrician working to local wiring regulations. Use it to start the conversation; it is not electrical engineering advice.

ตัวอย่างพร้อมวิธีทำ

The default site has 17.2 kW connected, a 4 kW starting surge from one air conditioner, a power factor of 0.8 and a 25% margin: about 33.1 kVA needed, so 45 kVA is recommended, loaded to about 24% and burning about 62 L of diesel a day.

สรุปสั้น ๆ

คำถามที่พบบ่อย

Why is the recommended set bigger than my connected load?

The size adds the largest starting surge, divides by the power factor to get kVA and then adds your margin, which is 25% unless you change it.

What starting surge factor should I use?

Use 1 for heaters, kettles and lamps. Motors, fridges and air conditioners commonly need about 3; the maker's starting data is better if you have it.

How is diesel per day calculated?

Average load in kW times 24 hours times the litres per kWh you enter, which defaults to 0.3.

What does phase imbalance mean?

It is the gap between the most and least loaded phase as a percentage of the most loaded. Above 20% the planner suggests moving equipment.

Why does it warn about light loading?

Diesel sets that run for long periods well below their rating can suffer wet stacking, so a very low load on the set is worth questioning.

Can it design the site's electrical installation?

No. Cabling, earthing and protection must be designed and installed by a competent person to local regulations.