Drawing and Document Register with Revision Control
Log every issue of every drawing and document with its number, title, discipline, revision, status and issue date; the register marks the latest issue as current and the older ones as superseded, groups revisions by drawing with a printable history, and exports to CSV for Excel.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1Project
Set the project and company names.
- 2Issue
Add the number, title, discipline and revision.
- 3Status
Choose the status and the issue date.
- 4Check
See which issue is current and which superseded.
- 5Share
Print revision histories or export CSV.
เกี่ยวกับเครื่องมือนี้
The Drawing and Document Register with Revision Control is a log of issues rather than a list of drawings. Every time a drawing, specification or report is issued, you add one line: the document number, its title, the discipline, the revision code, the status or suitability, the issue date, who issued it and a short description of what changed. Because each issue is its own line, the full history of a drawing builds up naturally, and nothing is overwritten when a new revision arrives. For each document number the register finds the issue with the latest date and marks it as current with a tick; every earlier issue of the same number is labelled superseded. When two issues share a date, the higher revision code wins. Status options follow the usual stages of a design: Preliminary, For information, For approval, For construction and As built. Disciplines cover architectural, structural, mechanical, electrical, plumbing, civil, landscape, fire and specifications, which makes it easy to filter the register before a design team meeting. The Summary tab has two groupings. Revision history by drawing shows each document with all its revisions in order, the current revision and its status, and prints a revision history sheet for any one drawing. By discipline counts how many current documents each discipline has. An insight warns you when a current drawing is still Preliminary, because work should not be built from a preliminary issue.
Who this is for
Document controllers on construction and engineering projects, site managers who need to know which revision is current before setting out, design coordinators, and small practices that issue their own drawings and need a simple register without a common data environment.
How to use it
1. Enter the project and company names in the settings. 2. Add a line for each issue with the number, title, discipline and revision. 3. Choose the status and record the issue date and who issued it. 4. Describe the change, for example the RFI or comment that caused it. 5. Check the current ticks, print a revision history or export the register.
What the sample shows
The sample register has five issues of three drawings. Ground floor plan A-101 was issued as P1 Preliminary on 4 August, as revision A For construction on 15 September, and as revision B on 30 October after the kitchen opening was widened following RFI-001. Only revision B carries the current tick; P1 and A are superseded. First floor framing S-201 rev B and ventilation layout M-401 rev P2 each have one issue, so both are current. The stat cards read 3 documents, 5 issues logged, 2 current documents For construction and 2 superseded issues. Because M-401 is current but still Preliminary, the insights panel warns that it should not be built from.
How current is decided
The rule is simple and visible: the latest issue date for a document number is current. This matches the way most sites work, where the newest transmittal replaces the drawing on the wall. It also means that a date typed wrongly can make an old revision look current, so check dates when you enter them. The revision code is used only to settle a tie between two issues on the same day. If a drawing is withdrawn rather than revised, add a final issue with a description such as Withdrawn so the history explains why it is no longer used.
Exports
Export CSV saves the register with the current or superseded column, ready to open in Excel. The JSON backup keeps every issue so another person can import the same register, and Print / PDF report prints the full log with the summary groups.
Limits
The register records what you type; it does not read title blocks or check revision codes against ISO 19650 naming rules, and it does not store the drawing files themselves. Data stays in this browser until you export it. Use it as a working record checked by your document controller; it is not contractual or design advice, and the current tick does not confirm that a drawing has been approved for construction.
ตัวอย่างพร้อมวิธีทำ
Sample: A-101 issued as P1, A and B; only rev B is current. 3 documents, 5 issues, 2 superseded, and M-401 P2 flagged as current but Preliminary.
สรุปสั้น ๆ
- หมวดหมู่: ธุรกิจและการทำงาน
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: ISO 19650 information management (status and revision) practice
คำถามที่พบบ่อย
Why add a new line for every revision?
Each line is one issue. Keeping old issues as separate lines gives you a complete revision history and lets the register mark the older ones superseded without losing them.
How does it decide which revision is current?
For each document number, the issue with the latest date is current. If two issues have the same date, the higher revision code is treated as current.
Can it hold specifications and reports as well as drawings?
Yes. Use any document number and pick Specification or Other as the discipline. The same current and superseded logic applies to every number.
What does the revision history sheet show?
For one drawing it lists each revision with its date, status, description and who issued it, ready to print or save as a PDF from the print dialog.
Can I export the register to Excel?
Export CSV writes the visible register to a CSV file that opens in Excel or Google Sheets. There is no native .xlsx download.
Does it follow ISO 19650?
It uses status and revision fields in the spirit of ISO 19650, but it does not enforce the standard's naming, suitability codes or workflow. Adapt your numbers to your project's information requirements.