Document Transmittal Form Maker
Write each transmittal with its number, date, recipient, purpose and method of sending, list the documents one per line with number, title, revision and copies, print a transmittal form for the recipient to sign and return, and see which transmittals are still not acknowledged.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1Settings
Enter the project and your company.
- 2Header
Add number, date, recipient and purpose.
- 3Documents
List number, title, revision and copies.
- 4Print
Print the form to send with the package.
- 5Acknowledge
Tick and date the returned form.
เกี่ยวกับเครื่องมือนี้
The Document Transmittal Form Maker produces the cover sheet that goes with every package of drawings and documents sent on a project, and keeps a register of all of them. A transmittal answers four questions that come up later in almost every dispute about information: what was sent, to whom, when, and for what purpose. Each entry has a transmittal number, a date, the recipient company and person, the sender, a purpose (for approval, for construction, for information, for comment, for tender or as requested) and the method used, which may be email, a document portal, post or hand delivery. The documents themselves go into a single box, one per line, written as number, title, revision and copies separated by a vertical bar, for example A-101 | Ground floor plan | B | 1. The register counts the lines to show how many documents each transmittal carried. If the copies figure is left off, the printed form shows 1. A notes box can carry instructions such as which revision is superseded. When the recipient signs and returns the form, or confirms receipt on the portal, tick Received / acknowledged and record the date. The printed form shows the project, the date, the recipient, the sender (your company name if the From field is empty), the purpose in bold, the sending method, a numbered table of documents, any notes, a request to acknowledge receipt and three signature cells.
Who this is for
Document controllers and project administrators, site managers sending drawings to subcontractors, design practices issuing to contractors, and anyone who has been asked to prove that a drawing was received.
How to use it
1. Enter your project and company in the settings. 2. Start a transmittal with its number, date, recipient, purpose and method. 3. List the documents one per line as number | title | revision | copies. 4. Print the transmittal form and send it with the documents. 5. Tick acknowledged and enter the date when the signed form comes back.
What the sample shows
Two transmittals are in the example. TR-014, dated 30 October, went to Northside Groundworks through the document portal For construction and lists three documents: A-101 rev B, S-201 rev B and S-202 rev A, with a note that A-101 rev B supersedes rev A. It was acknowledged on 31 October. TR-015, dated 3 November, went to City Building Control by email For approval with two documents, the fire strategy F-001 rev C and riser details A-310 rev C, and has not yet been acknowledged. The stat cards show 2 transmittals, 5 documents sent and 1 not acknowledged.
The register by recipient
The Summary tab groups transmittals by recipient and counts how many transmittals and documents each company has received. This is useful when a subcontractor says they never had a drawing: open their group and you can see every package sent to them. Pair the register with a drawing register so that the revision on each transmittal matches the current issue.
Good transmittal habits
Number transmittals in one sequence for the whole project, even when the same person sends them by different routes, so that a gap in the numbers shows a missing record. Write the purpose carefully: a drawing sent For information should not be built from, and a package For construction tells the recipient to replace older copies on site. Where a revision supersedes an earlier one, say so in the notes, as the sample does for A-101.
Exports
Each transmittal prints on its own as a form, and Print / PDF report prints the whole register. Export CSV gives a spreadsheet of the register for Excel, and the JSON backup keeps every transmittal with its document lines.
Limits
The form does not send anything; email or upload the documents yourself and attach the printed or PDF form. The tool does not check that a revision on a transmittal is the current one. Everything is stored in this browser on this device, so export a backup and keep the signed forms in your project filing. A transmittal record helps show what was issued but is not legal advice on proof of delivery under your contract.
ตัวอย่างพร้อมวิธีทำ
TR-014: 3 documents For construction to Northside Groundworks, acknowledged 31 October; TR-015: 2 documents For approval, not acknowledged. Totals 2 transmittals, 5 documents.
สรุปสั้น ๆ
- หมวดหมู่: ธุรกิจและการทำงาน
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: Construction document control practice (transmittals and acknowledgement)
คำถามที่พบบ่อย
What is a document transmittal?
A cover sheet that lists the drawings and documents sent in one package, with their revisions, the number of copies and the reason for sending, signed by the recipient as proof of receipt.
How do I list the documents?
One document per line, with number, title, revision and copies separated by a vertical bar. If you leave out the copies, the form prints 1.
Which purposes can I choose?
For approval, For construction, For information, For comment, For tender and As requested. The purpose is printed in bold on the form so the recipient knows what to do with the documents.
How do I record that the documents were received?
Tick Received / acknowledged and enter the date when the signed form or a portal confirmation comes back. The register counts transmittals still not acknowledged.
Can I see everything sent to one subcontractor?
Yes. The Summary tab groups transmittals by recipient with the number of transmittals and documents for each.
Is the register saved online?
No. It stays in this browser. Use Backup (JSON) to move it to another computer and Export CSV to share it as a spreadsheet.