Deferred Defect and MEL Item Tracker
Log each deferred item with its MEL number, category and deferral date to see the due date, days left, a red or amber warning, missing placards and a deadline list.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1Set tails
List your aircraft.
- 2Add item
MEL number and defect.
- 3Pick category
B, C, D or a limit date.
- 4Watch days
Amber and red warnings.
- 5Close out
Rectify and record.
เกี่ยวกับเครื่องมือนี้
The Deferred Defect and MEL Item Tracker keeps open deferrals in view so none of them quietly runs out. For each item you record the tail number, the MEL or CDL item number, the defect, the rectification interval category and the date it was deferred. Category B adds 3 calendar days, C adds 10 and D adds 120 to the deferral date to give the due date. Category A, a non-MEL deferred defect or an approved extension uses a limit date you type in. You can note the operational and maintenance procedures carried out, tick that a placard is fitted, list parts on order and set the status to Open, Rectified or Extended, with a closing entry once the item is fixed. The tracker shows the days left, turns amber with three days or fewer, red with one day or fewer, and marks the item EXPIRED: aircraft not serviceable once the date has passed. Counters highlight open, expired and placard-missing items, and a deadline list can be exported to your calendar. It is a personal and training record, not an approved deferred defect system or technical log.
Who this is for
Line engineers and technical log clerks who want a second view of open deferrals, maintenance control trainees learning how MEL categories work, flight crew students studying the dispatch process, and small operators building their own awareness of what is due this week.
How to use it
1. List your tail numbers in Settings. 2. Press Load example to see three items: a logo light in category D, a pack temperature control in category C and a rectified standby altimeter item in category B. 3. Add an item: tail, MEL item number and a clear defect description. 4. Pick the category and enter the date deferred. 5. For category A, a non-MEL deferral or an extension, type the limit date. 6. Record the (O) and (M) procedures done, tick Placard fitted and note parts on order. 7. When the defect is fixed, set Rectified and write the closing entry.
How the due date is worked out
For B, C and D the due date is the deferral date plus 3, 10 or 120 days. If a limit date is entered, it is used instead, which is how category A items and extensions are handled. Days left are counted from today. With more than three days left the status simply shows the number of days, three days or fewer turns amber, one day or fewer turns red, and a date in the past shows the expired warning.
Counting the days
Many authorities do not count the day of discovery, and the tracker's B, C and D dates follow that by adding the full interval to the deferral date. Some operators' MELs count differently, start the clock at a set time of day, or allow a single extension under strict conditions. Check your approved MEL preamble and type a limit date whenever your rule gives a different answer.
Views
The table shows tail, MEL item, defect, category letter, deferral and due dates and status. The Board tab sorts items into Open, Rectified and Extended columns. Rectification deadlines lists open items with a date, highlights those within 3 days and offers an .ics download, and the Summary tab gives open items and the next due date per tail. Placard missing counts open items without the placard box ticked, a quick prompt before an aircraft is dispatched.
Saving your list
Items stay in this browser. Export a CSV, print a PDF report or back up to JSON.
A quick daily routine
At the start of each day, open the Rectification deadlines tab, check anything amber or red against parts on order, and confirm placards are still fitted on open items. Close an item only after the rectification entry is made in the technical log, then mirror the wording in the closing entry here.
Limits
Category A intervals, repair interval extensions, dispatch conditions, flight-hour or cycle limits stated in some MEL remarks, and the link between items are not worked out for you, and there is no check that an item is actually in your MEL. It is a reminder and training record, not airworthiness or dispatch advice; the approved MEL, the aircraft's technical log and your organisation's procedures decide whether an aircraft may be dispatched.
ตัวอย่างพร้อมวิธีทำ
A category C pack defect deferred on 30 October 2026 is due on 9 November, so on 3 November it shows 6 days left; the category D logo light deferred on 10 October is due on 7 February 2027.
สรุปสั้น ๆ
- หมวดหมู่: วิศวกรรมและก่อสร้าง
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: MMEL / MEL rectification interval categories A, B, C and D
คำถามที่พบบ่อย
How many days do categories B, C and D allow?
The tracker uses 3, 10 and 120 calendar days added to the deferral date.
How do I handle a category A item?
Type the limit date from the MEL remarks into the limit date box.
What does EXPIRED mean?
The due date has passed while the item is open, so the aircraft should not be treated as serviceable.
Does it remind me about placards?
Yes, open items without Placard fitted ticked are counted as placard missing.
Can I add deadlines to my calendar?
Yes, the Rectification deadlines tab exports an .ics file.
Is this an approved deferred defect system?
No, it is a training and personal record; the approved MEL and technical log rule.