Certified Payroll WH-347 Builder
Enter workers, classifications and daily hours to compute straight time, overtime, fringe and net pay, check rates against the wage determination and print the statement of compliance.
ทำงานในเบราว์เซอร์ของคุณ ไฟล์ไม่ออกจากอุปกรณ์ ดูวิธีตรวจสอบ
…
วิธีทำ
- 1Enter the project
Add contractor, project, location, contract number, payroll number and week ending.
- 2Enter the wage determination
Copy each classification's base rate and fringe from the contract.
- 3Add workers
Enter each worker's identifier, classification, rate and fringe.
- 4Enter daily hours
Type hours for each day and the withholdings from your payroll system.
- 5Fix shortfalls
Correct any worker flagged below the determination.
- 6Sign and print
Fill in the signer and fringe plan, then print the payroll and statement.
เกี่ยวกับเครื่องมือนี้
Contractors on federally funded construction projects covered by the Davis-Bacon Act must pay prevailing wages and submit a certified payroll every week. Mistakes in classifications, overtime or fringe benefits are the most common audit findings. This builder prepares the information in the order of Form WH-347. Enter the contractor, project, contract number, payroll number and week ending date. Copy the classifications and rates from the wage determination, base rate plus fringe. For each worker enter name, last four digits of an identifier, classification, hourly rate, fringe rate, hours each day, and withholdings; tick if fringe is paid in cash. The tool computes straight-time and overtime hours, gross pay including cash fringe, deductions and net pay, and warns when a worker's rate plus fringe is below the determination for the classification. The statement tab prints the payroll with a statement of compliance for signature.
What certified payroll requires
Under 29 CFR 5.5, contractors and subcontractors on covered contracts must submit weekly payrolls for every week work is performed, through the prime contractor to the contracting agency, with a signed statement of compliance. Each payroll shows each worker's name and an identifying number, classification, hours worked each day and week, rate of pay, fringe benefits, gross wages, deductions and net wages. Form WH-347 is optional; any form with the same information and the statement is acceptable.
Prevailing wage and fringe benefits
The wage determination in the contract lists a base hourly rate and a fringe benefit rate for each classification. Workers must receive at least the base rate in cash, and the fringe amount either as contributions to bona fide plans (health, pension, vacation) or as additional cash. Workers who perform work in more than one classification must be paid the rate for each, with hours recorded separately.
Overtime
The Contract Work Hours and Safety Standards Act requires overtime at one and a half times the basic rate of pay for hours over 40 in a workweek. Fringe benefits are not included when computing the overtime premium.
Statement of compliance
The signer certifies that everyone was paid the full weekly wages earned, that no rebates were taken, that only permissible deductions were made, that rates meet the wage determination, and how fringe benefits were provided. Falsification is a federal offense. Keep payroll records for three years after the work is completed.
Worked example
On a bridge project, a laborer works 42 hours at $31.20 with fringes paid to the union plan: gross pay is $1,341.60 including 2 overtime hours at $46.80. A cement mason paid $36.75 plus $24.10 cash fringe for 40 hours earns $2,434. An operator paid $41.00 against a determination of $42.50 is flagged as $1.50 an hour short.
Limits
This builder prepares information in the WH-347 layout; it is not the official form and not legal advice. Wage determinations, apprentice ratios and state prevailing wage laws add rules. Check your contract and the contracting agency's requirements.
ตัวอย่างพร้อมวิธีทำ
Laborer 42 hours at $31.20: $1,341.60 gross; operator paid $41.00 against $42.50 flagged $1.50 an hour short.
สรุปสั้น ๆ
- หมวดหมู่: ธุรกิจและการทำงาน
- ทำงานในเบราว์เซอร์ ไม่ต้องสมัคร ไม่ต้องอัปโหลด
- ข้อมูลที่คุณกรอกอยู่บนอุปกรณ์ของคุณ
- มีภาษาอังกฤษ
- ตรวจสอบเนื้อหาล่าสุด:
- แหล่งข้อมูลทางการ: US Department of Labor, Wage and Hour Division: Davis-Bacon certified payroll (Form WH-347 instructions, 29 CFR 3.3 and 5.5)
คำถามที่พบบ่อย
What is certified payroll?
A weekly payroll report with a signed statement of compliance that contractors on Davis-Bacon covered projects submit to show prevailing wages were paid.
Do I have to use Form WH-347?
No. WH-347 is optional; any format with the same information and a signed statement of compliance is acceptable.
How are fringe benefits paid?
As contributions to bona fide benefit plans, as additional cash wages, or a combination, so that the total meets the wage determination.
Is overtime calculated on the fringe rate?
No. Overtime is one and a half times the basic hourly rate; the fringe benefit amount is not multiplied.
When are certified payrolls due?
Weekly, for every week in which work is performed on the covered contract, submitted through the prime contractor.
How long must records be kept?
For three years after all work on the prime contract is completed.
