Safe Work Method Statement (SWMS) Generator
Choose the high risk construction work involved, list each step with its hazards and controls, and print a SWMS for workers to sign.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Enter the job
Type the company, site, task and supervisor.
- 2Choose the HRCW
Pick up to three kinds of high risk construction work.
- 3List steps
Add each step with its hazard, risk, controls and who is responsible.
- 4Add PPE and review
Type the PPE and how controls will be checked.
- 5Consult and sign
Go through it with workers and have them sign.
About this tool
Before high risk construction work starts, the business doing it must prepare a safe work method statement (SWMS). The model WHS Regulations list 18 kinds of high risk construction work, including work where someone could fall more than two metres, work near energised electrical services, work in trenches deeper than 1.5 metres, work disturbing asbestos, and work where powered mobile plant moves around. A SWMS must identify the high risk work, the hazards and risks, the control measures, and how the controls will be put in place, monitored and reviewed. It must be written in a way workers can understand, given to the principal contractor, kept on site and reviewed when the work changes. This generator builds a SWMS from your job steps: each with its hazard, a risk rating, the controls and who is responsible, plus PPE, monitoring and a sign-off table for workers.
Who this is for
Subcontractors, small builders, trade businesses and sole traders doing high risk construction work, and principal contractors checking SWMS from their trades.
The 18 kinds of high risk construction work
They include risk of a fall of more than 2 metres; work on telecommunication towers; demolition of load-bearing elements; disturbing asbestos; structural alterations needing temporary support; confined spaces; shafts or trenches deeper than 1.5 metres and tunnels; explosives; pressurised gas mains; chemical, fuel or refrigerant lines; energised electrical installations; contaminated or flammable atmospheres; tilt-up or precast concrete; work next to roads, railways or shipping lanes; areas with powered mobile plant; artificial extremes of temperature; water or liquid with a drowning risk; and diving work.
Writing the steps
Break the job into steps in the order they happen. For each, list: - the hazard (what could cause harm), - the risk before controls (high, medium, low), - the control measures, following the hierarchy: eliminate, substitute, isolate, engineering controls, administrative controls, then PPE, - who is responsible. Be specific to the site. "Use edge protection" is weaker than "edge protection on all open edges before roof access, checked by the supervisor each morning".
Consultation and sign-off
Go through the SWMS with workers before work starts, and have each worker sign. New workers sign when they arrive. Workers must be able to read and understand it, so consider translations or pictures.
Keeping and reviewing
Keep the SWMS on site until the work is finished and for two years if there is a notifiable incident. Review it when the work changes, after an incident, or when a control does not work. If work is not being done in line with the SWMS, it must stop until the SWMS is reviewed.
Worked example
A roofing crew replacing a metal roof on a two-storey house identifies falls from height and powered mobile plant (a crane). Steps cover scaffold and edge protection, removing old sheets, crane lifts with an exclusion zone, and fixing new sheets, each with controls and a responsible person.
Limits
A template, not a substitute for a site-specific risk assessment. Your state's WHS laws apply.
Worked example
A roofing SWMS covering falls and a crane lift, with four steps and worker sign-off.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: Model Work Health and Safety Regulations r 291 (18 kinds of high risk construction work) and r 299-303: a safe work method statement must identify the high risk construction work, the hazards and risks, the control measures and how they are implemented, monitored and reviewed, and be kept and reviewed on site
Frequently asked questions
When is a SWMS required?
Before any of the 18 kinds of high risk construction work.
Who prepares the SWMS?
The business carrying out the high risk construction work, with its workers.
Does it need to be signed?
Workers should sign to show they have read and understood it.
How long must I keep it?
Until the work is finished, and two years after a notifiable incident.
When must it be reviewed?
When work changes, after an incident, or when a control is not working.
Is my data stored?
Only in your browser.