Small Business

How to Write a SWMS: High Risk Construction Work, Hazards and Controls

When a safe work method statement is required, the 18 kinds of high risk construction work, how to write steps, hazards and controls, and sign-off.

Saizul Amin
Saizul Amin29 Oct 2026 · 3 min read
How to Write a SWMS: High Risk Construction Work, Hazards and Controls

How to Write a SWMS: High Risk Construction Work, Hazards and Controls

Principal contractors ask every trade for a safe work method statement before high risk work starts. Many SWMS are copied from a template and never read. A good one is short, specific to the job, and actually used on site. The Safe Work Method Statement Generator helps you build that kind of SWMS.

When you need a SWMS

Under the model WHS Regulations, a SWMS must be prepared before any of the 18 kinds of high risk construction work begin. These include:

  • work where a person could fall more than 2 metres,
  • work on telecommunication towers,
  • demolition of load-bearing elements,
  • work likely to disturb asbestos,
  • structural alterations needing temporary support,
  • work in or near confined spaces,
  • work in or near shafts or trenches deeper than 1.5 metres, or tunnels,
  • use of explosives,
  • work on or near pressurised gas mains, or chemical, fuel or refrigerant lines,
  • work on or near energised electrical installations,
  • work in contaminated or flammable atmospheres,
  • tilt-up or precast concrete,
  • work on or next to roads, railways or shipping lanes used by traffic,
  • work where powered mobile plant moves,
  • work in artificial extremes of temperature,
  • work in or near water with a risk of drowning,
  • diving work.

The duty sits with the business doing the high risk work, which then gives the SWMS to the principal contractor before work starts.

What a SWMS must contain

  • The high risk construction work involved.
  • The hazards and risks of that work.
  • The control measures.
  • How the control measures will be implemented, monitored and reviewed.

It must be written in a way that the workers who use it can understand.

Writing the steps

Break the job into steps in the order they happen. For each step, write:

  1. The hazard: what could hurt someone, such as falling through a roof, being struck by a crane load, or electric shock.
  2. The risk before controls: high, medium or low, from how likely and how serious the harm is.
  3. The controls: what you will do, following the hierarchy of controls: eliminate the hazard, substitute something safer, isolate people from it, use engineering controls such as guardrails, then administrative controls such as permits and exclusion zones, and finally PPE.
  4. Who is responsible: a named role, such as the supervisor or the crane operator.

Be specific. "Exclusion zone with barriers and a spotter during every lift" is clearer than "control the area".

PPE and monitoring

List the PPE needed for the work. Then say how you will check the controls: a supervisor walk-around at the start of each shift, a scaffold tag check, a daily pre-start for plant. State when the SWMS will be reviewed: when work changes, after an incident or near miss, or when a control is not working.

Consultation and sign-off

Go through the SWMS with the workers before the work starts, and ask for their input; they often know the hazards best. Each worker signs to confirm they understand it. New workers sign when they join. Keep the SWMS on site and accessible.

A worked example

A roofing contractor is replacing a metal roof on a two-storey house. The high risk work is a fall of more than 2 metres and powered mobile plant, because a crane lifts the sheets. The steps are: set up scaffold and edge protection, remove old sheets, lift new sheets with the crane, and fix the sheets and flashings. Each has controls, such as edge protection on all open edges before roof access, a licensed dogman and crane operator, and an exclusion zone.

If work does not follow the SWMS

The work must stop, or not start, until the SWMS is reviewed and workers are told of any changes. That rule is what makes a SWMS a working document rather than paperwork.

Limits

The generator is a template and does not replace a site-specific risk assessment. Your state's WHS laws and codes of practice apply. Your entries stay in your browser.

Completely freeNo cost, no sign-up
Files stay privateEverything runs in your browser
Easy in your languageAvailable in many languages