Gemba Walk Checklist and Notes
Pick the area and a standard gemba question, write what you saw, add photos, mark it as good practice, issue, safety point or idea, give issues an action, owner and follow-up date, and print a summary of open actions by owner before the next walk.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Settings
Enter the site and walk leader.
- 2Observe
Pick the area and the question asked.
- 3Record
Write what you saw and add photos.
- 4Act
Give issues an owner and follow-up date.
- 5Review
Print open actions before the next walk.
About this tool
The Gemba Walk Checklist and Notes is a notebook for managers who go to the place where the work is done, ask the people doing it what gets in their way and come back with a short list of actions. Gemba is the Japanese word for the actual place, and the walk is meant for observing and listening, not for inspecting people. Each note records the date, the area and the question you asked. The areas start as goods in, stores, machining, assembly, packing, dispatch and office. Seven standard questions are built in: whether standard work is posted and followed, whether today's target and performance are visible, what problems people had today, whether everything is in its place (5S), whether there are safety hazards, where work is waiting in queues or inventory, and what would make the job easier. An Other option covers anything else. You then write the observation and attach photos from a phone or tablet. Every note is typed as good practice, issue, safety point or idea, which keeps positive findings on the record next to problems. When something needs doing, add the action, the owner and a follow-up date, and set the status to Open, Done or No action. The board view shows notes as cards in those three columns, so a quick drag through the list at the next huddle shows what moved. Open safety items are listed in the insights panel until they are closed.
Who this is for
Plant and operations managers, lean and continuous improvement leads, team leaders who walk their own area each day, warehouse and office managers, and anyone starting a leader standard work routine.
How to use it
1. Set the site name and the walk leader in the settings. 2. At each stop, choose the area and the question you asked. 3. Write the observation, add a photo and choose its type. 4. For issues and safety points, agree an action, an owner and a date. 5. Print the open actions summary and review it at the start of the next walk.
What the sample shows
The example walk on 4 November at an assembly plant has four notes. In assembly the hour-by-hour board was filled in only up to 10:00, an issue given to team leader A to update hourly, with a follow-up on 6 November. In stores a pallet was overhanging the racking beam at bay 12, a safety point that the stores supervisor fixed the same day. In packing an operator said the tape guns jam and suggested another model, an idea with a two-gun trial due on 18 November. In machining the setter was following the posted changeover sheet step by step, logged as good practice with no action. The stat cards show 4 observations, 2 open actions and 1 safety item, and the assembly action shows as overdue once 6 November has passed.
Summaries
The Summary tab has two groupings. Open actions by owner lists each person with their number of actions and the next due date, and prints an open actions summary for each owner; closed and no-action notes are gathered under Closed. By area counts observations and issues for each area, which shows over several walks where problems keep appearing. The Gemba follow-ups tab lists open actions by date and can add them to a calendar with an .ics file.
Tips for useful walks
Walk the same route at the same time so that changes are easy to see. Ask open questions and write down the answer in the worker's words. Record good practice as well as problems, so that the log does not become a fault-finding exercise, and close the loop by telling people what happened to their idea.
Limits
The questions are common lean prompts, not a fixed standard; change the area list and add your own questions through the Other option and the notes. Photos are stored in this browser and travel only in the JSON backup, so export after each walk. A gemba log records observations and actions; it is not a safety inspection or risk assessment, and it is not health and safety advice.
Worked example
Assembly plant walk, 4 November: 4 notes (issue, safety, idea, good practice); 2 open actions; the overhanging pallet at bay 12 closed the same day.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: Lean gemba walk practice
Frequently asked questions
What is a gemba walk?
A planned visit by a manager to the place where work happens, to observe the process, ask the people doing it about problems and agree improvements. It is about the process, not about checking on individuals.
Which questions are built in?
Seven: standard work, visible targets, today's problems, 5S, safety hazards, where work is waiting and what would make the job easier, plus Other for your own question.
Can I add photos from my phone?
Yes. Use Add photos on each note. Images are reduced in size and kept in this browser, and they print with the report.
Why log good practice?
It shows people that the walk notices what goes well, and it records methods worth copying to other areas, such as the changeover sheet in the sample.
How do I follow up actions?
Give each action an owner and a follow-up date. The open actions summary lists them by owner, the follow-ups tab sorts them by date and overdue ones are counted on the stat cards.
Can I change the list of areas?
The built-in areas are fixed in this version. Choose the nearest area and name the exact place in the observation text, or use the notes to add detail.