Gemba Walks: Questions to Ask and How to Follow Up
How to plan a gemba walk, which questions to ask in each area, how to record observations fairly and how to turn what you see into owned actions.

Gemba Walks: Questions to Ask and How to Follow Up
Gemba is the Japanese term for the actual place where value is created: the shop floor, the warehouse, the service counter. A gemba walk is a planned visit by a manager to see the work, ask the people doing it what gets in their way and agree improvements. It is one of the simplest lean practices and one of the easiest to get wrong.
Purpose first
A gemba walk is not an inspection and not a chance to tell people off. Its purpose is to understand the process. Managers who walk with a clipboard of faults soon find that people stop telling them about problems. Managers who listen, write down what they hear and come back with answers find that people start bringing problems to them.
A standard set of questions
Using the same questions on each walk makes changes over time easy to see. Seven work in most settings:
- Is the standard work posted and followed?
- Is today's target and performance visible?
- What problems did you have today?
- Is everything in its place?
- Are there safety hazards?
- Where is work waiting?
- What would make your job easier?
Worked example
The Gemba Walk Checklist and Notes sample is a walk on 4 November around an assembly plant, led by the plant manager. Four stops produced four different kinds of note.
In assembly, the hour-by-hour board had been filled in only up to 10:00. That is an issue: the team cannot react to a missed hour if nobody records it. The action is for team leader A to update the board every hour and review it at the 13:00 huddle, with a follow-up on 6 November.
In stores, a pallet was overhanging the racking beam at bay 12. That is a safety point, fixed the same day by re-stacking and a briefing for forklift drivers.
In packing, an operator said the tape guns keep jamming and suggested a different model. That is an idea, and the action is a trial of two tape guns by 18 November.
In machining, the setter was following the posted changeover sheet step by step, recorded as good practice with no action. Recording it matters: it shows that the walk notices what works and gives you a method to copy to other machines.
The stat cards show 4 observations, 2 open actions and 1 safety item. Once 6 November passes without the assembly action being closed, it counts as overdue.
Following up
The open actions summary groups actions by owner with the next due date and prints a sheet for each person. Start the next walk by reviewing it. The follow-ups list exports to a calendar, and the board view lets you move each note from Open to Done as actions are completed.
Over several walks, the By area summary shows where issues keep appearing. If packing produces an idea every week, that team is engaged; if one area never produces a note, ask whether people there feel able to speak up.
Common mistakes
Walking without a question. Without a focus, a walk becomes a tour. Pick the question for each stop in advance.
Solving problems on the spot. It feels helpful, but it teaches people to wait for the manager. Agree an owner from the team where you can.
Only recording problems. A log full of faults makes the walk feel like an audit. Note good practice too.
No follow-up date. An action without a date is a wish. Every issue needs an owner and a date.
Losing the photos. Photos are stored in the browser on the device you used. Export the JSON backup after each walk.
Keep it in proportion
A gemba walk log records observations and agreed actions. It does not replace safety inspections, risk assessments or audits, and the questions are common lean prompts rather than a formal standard.