Gantt Chart Maker

Lay out who does what and when, find which tasks decide the finish date, and share the plan as a picture or a spreadsheet.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    Name the project

    Type a project name and edit or delete the sample tasks.

  2. 2
    Add tasks

    Press Task or Milestone and set start date, duration and owner.

  3. 3
    Link them

    Enter predecessor row numbers in the After column.

  4. 4
    Choose the calendar

    Turn auto-schedule and Skip weekends on or off.

  5. 5
    Adjust in the chart

    Drag bars to move them and drag the right end to resize.

  6. 6
    Export

    Download PNG, PDF, XLSX, CSV or the project file.

About this tool

A Gantt chart puts each task of a project on its own row and draws a bar from its start to its finish, so overlaps, gaps and deadlines are visible at a glance. It becomes a planning tool when tasks are linked: if the build cannot start before the design is approved, moving the design should move the build too. This maker keeps a task table and a chart side by side. Each task has a name, start date, duration in days, the tasks it waits for, a percentage done and an owner. With auto-schedule on, a task starts on the later of its own start date and the finish of everything it depends on, so a single change ripples through the plan. Milestones are zero-length tasks drawn as diamonds. The critical path method then runs a backward pass from the project's finish to work out how late each task could start without delaying the end. That spare time is called slack or float; tasks with none are critical and drawn in red, and the summary lists the critical chain in order. Turn on Skip weekends and durations count working days, so a five-day task starting on Thursday finishes on the following Wednesday.

Editing in the chart

- Drag the middle of a bar to move a task to another day; drag its right end to make it longer or shorter. - The table edits the same data: dates, durations, dependencies by row number, progress and owner. - Arrows show dependencies; red arrows join critical tasks. - Reorder rows with the arrow buttons and remove tasks with the cross, which also removes links to them. - Undo and redo cover every change, and the plan is saved in this browser.

Reading the plan

The summary shows the start and finish dates, the total length in calendar days, the number of critical tasks and a weighted percentage complete, in which longer tasks count more. The Slack column shows how many days each task can slip. A dashed orange line marks today. When auto-schedule is off, a task that starts before its predecessor ends is flagged so you can decide what to do.

Exports

PNG and PDF are ready for reports and status emails. The XLSX file holds one row per task with real date cells, duration, dependencies, progress as a percentage, slack and a critical flag, so it can be filtered or extended in Excel or Google Sheets. CSV import accepts columns for task, start date, duration, dependencies by row number, progress and owner.

Limits

Dependencies are finish-to-start only; start-to-start links, lags, leads and resource levelling are not modelled. Holidays other than weekends are not skipped automatically, so lengthen tasks that span them. One project per file. This is a planning aid for small and medium projects; it does not replace scheduling software that tracks costs, baselines and team capacity.

Worked example

A website launch has 7 rows: a kick-off milestone, requirements (4 days), design (6), content (8), build (10), testing (5) and go-live. Starting Monday 2 March 2026 with weekends skipped, testing ends on Friday 3 April and go-live falls on Monday 6 April. The critical path runs requirements, design, build, testing; content has 8 days of slack, so the writer's sick week does not move the launch.

Quick facts

Frequently asked questions

What is the critical path?

The chain of tasks with zero slack. Any delay on it delays the whole project.

How do I link tasks?

Type the row numbers of the tasks it waits for in the After column, for example 2,3.

Can I skip holidays?

Weekends are skipped when the option is on; add extra days to tasks that cross public holidays.

Does the Excel export keep dates?

Yes. Start and end are real date cells, and progress is a percentage.

Is my plan uploaded?

No. It is saved in your browser; export a project file to move it to another device.

Why did my task move when I changed another one?

Auto-schedule starts each task after the tasks it depends on finish.

Guides for this tool

Completely freeNo cost, no sign-up
Files stay privateEverything runs in your browser
Easy in your languageAvailable in many languages