Construction Loan Calculator

Enter the build budget, land value, loan-to-cost limit, rates and a draw schedule by stage and month to see the loan size, the interest you pay during the build and the permanent mortgage payment.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    Project

    Budget and land value.

  2. 2
    Loan

    LTC, rates, term and fees.

  3. 3
    Draws

    Stages, shares and months.

  4. 4
    Read

    Build interest and final payment.

  5. 5
    Compare

    Test a delayed build.

About this tool

The Construction Loan Calculator follows a house build month by month, the way a construction lender actually releases and charges money. Unlike a normal mortgage, a construction loan is not handed over in one go. The lender pays the builder in draws as each stage is finished and inspected, and during the build you pay interest only on what has been drawn so far. The tool starts with your construction budget and the value or price of the land. It applies the lender's loan-to-cost limit to the total of land and build, and caps the loan at the construction budget, so land you already own often counts as your equity. The draw schedule is an editable table. Each row has a stage name, the share of the budget released at that stage and the month it is drawn. The default plan runs foundation, framing, roof and rough-ins, insulation and drywall, finishes and completion across a 12-month build. For every month the calculator adds that month's draws, charges a month of interest at the construction rate on the running total, and records the payment. When the build ends, the drawn balance converts to a permanent mortgage at the permanent rate and term you choose. The results show the loan size, the cash you put in, interest during the build, the highest interest-only payment, the payment after conversion and the construction loan fees. A bar chart shows the interest payment rising month by month, a line chart traces the drawn balance, and the draw schedule table lists each release with the running total. All rates and limits are editable examples; your lender's commitment letter sets the real terms and draw rules.

Who this is for

People building a custom home on their own lot, buyers working with a builder who needs construction-to-permanent financing, owner-builders checking a budget, and anyone worried about what a delay will cost.

How to use it

1. Enter the construction budget ($420,000 by default) and the land value or price ($120,000). 2. Set the loan-to-cost limit (80%), the construction interest rate (8.75%), the permanent mortgage rate (6.75%), the permanent term (30 years) and construction loan fees (1% of the loan). 3. Edit the draw schedule. Each row needs a stage, a percentage of the budget and the month it is drawn. Rows are sorted by month automatically. 4. Set the build length in months (12). Interest keeps running until the last month of the build, even after the final draw. 5. Read the KPIs, the two charts and the draw table. A note confirms whether your draw percentages add up to 100%.

How interest during the build is worked out

Each month, the draws scheduled for that month are added to the drawn balance first, then a month of interest is charged on the new balance at the construction rate divided by twelve. Interest during the build is the sum of these monthly charges. If the lender lends less than the full budget, each draw is scaled down by the same share, so you fund the rest of each stage yourself. The permanent payment is a standard 30-year (or your chosen term) payment on the total drawn.

Reading the default build

Land plus build totals $540,000, and 80% of that is $432,000, so the loan is capped at the $420,000 budget and your $120,000 land covers the equity. The first draw of $63,000 in month 1 costs about $459 a month in interest. By month 11 the full $420,000 is drawn and the interest-only payment peaks at about $3,063. Interest over the 12-month build totals roughly $22,356, plus $4,200 of loan fees. After conversion the 30-year payment at 6.75% is about $2,724 a month. The delay preset stretches the build to 16 months with the same draws, which adds four more months at the peak payment and lifts interest during the build to about $34,606, some $12,250 more.

Planning for delays and rate changes

Add a build with + Build, change the build length, a draw month or the rate, and open Compare all to see the difference in interest and payments, with the drawn-balance chart overlaid. Print / PDF report gives a printable summary with the draw table, and Export JSON saves the project. Your inputs are stored only in this browser.

Limits

Draws that fall after the last build month are never counted. The model does not include contingency reserves, inspection fees, an interest reserve held by the lender, or a rate lock on the permanent loan. Fees are shown but not added to the loan. Use it to plan cash flow and compare scenarios; it is not financial advice, and the lender's loan agreement and draw rules decide the real figures.

Worked example

A $420,000 build on $120,000 of land, drawn over 12 months at 8.75%, costs about $22,356 in interest during the build and about $2,724 a month after converting to a 30-year loan at 6.75%.

Quick facts

Frequently asked questions

Why do I only pay interest during the build?

Most construction loans are interest-only until completion, and the interest is charged only on money already drawn.

What does loan-to-cost mean?

It is the share of land plus build cost that the lender will finance. The rest is your equity, often the land itself.

What happens if my draws do not add up to 100%?

The calculator warns you in the notes, and the loan and permanent payment are based only on what is actually drawn.

How much does a delay cost?

Increase the build length. Each extra month adds a full month of interest on the drawn balance; in the default build that is about $3,063.

Is this a one-time close or two-time close loan?

The arithmetic is the same. A one-time close converts automatically; a two-time close needs a second closing with its own costs.

Can I change the stages?

Yes. Rename, add or delete rows in the draw schedule and set your own percentages and months.