Building Contract Progress Payment Schedule (by State)
Choose the state, enter the contract price and deposit, list each stage with its percentage, and see the amounts and any breach of the legal limits.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Choose your state
NSW, Victoria or Queensland.
- 2Enter the contract price
Including GST.
- 3Enter the deposit
As a percentage.
- 4List the stages
Name and percentage.
- 5Check the warnings
Deposit and stage limits.
About this tool
Building a home is paid for in stages: a deposit when the contract is signed, then progress payments as the work reaches milestones such as base, frame, lock-up and fixing, and a final payment at completion. State laws limit the deposit, and Victoria also limits the share of the price payable at each stage of a new home. Paying too much too early leaves owners exposed if the builder fails. This planner sets out the schedule, the amount at each stage and warns when the deposit or a Victorian stage is above the legal limit.
Who this is for
Home owners signing a building contract, builders preparing schedules and conveyancers checking contracts.
Deposit limits
NSW: up to 10% of the contract price for residential building work. Victoria and Queensland: up to 10% for contracts under A$20,000 and 5% for contracts of A$20,000 or more. Queensland allows a higher deposit where more than half the work is done off site.
Victorian stage limits
For a contract to build a home through all stages, the Domestic Building Contracts Act limits payments to: deposit 5%, base 20%, frame 25%, lock-up 20%, fixing 20%, with the balance at completion. A builder cannot claim more than these percentages for each stage unless the contract is for only some stages.
Typical stages
Base: the slab or footings are complete. Frame: the frame is up and approved. Lock-up: external walls, roof, windows and doors are installed. Fixing: internal linings, cabinets and fittings are in. Completion: the work is finished, with an occupancy permit or certificate where needed.
A worked example
A A$480,000 Victorian home contract has a 5% deposit of A$24,000, then base A$96,000, frame A$120,000, lock-up A$96,000, fixing A$96,000 and completion A$48,000. The deposit and each stage are within the limits.
Before paying each stage
Check that the stage is actually complete, preferably with an independent inspector. Do not pay ahead of the work.
Questions owners ask
Can the builder ask for more for materials? Not above the legal limits for deposits and stages. What if the stage is not finished? You do not have to pay until it is. What about variations? Agree them in writing, with the price, before the work is done.
## Keeping records Keep every progress claim, invoice and receipt together with photos of the work at each stage. If a dispute arises, a clear record of what was claimed, when and for what milestone helps the regulator or tribunal resolve it quickly. Lenders financing construction often release funds by stage too, so align the contract schedule with the bank's drawdown schedule before signing.
## Final payment Before making the final payment, walk through the finished home with the builder, list any incomplete or defective items in writing, and confirm the occupancy permit or final certificate has been issued.
Limits
Contracts may set their own stages within the legal limits. A guide only, not legal advice.
Worked example
A A$480,000 Victorian contract: A$24,000 deposit, then A$96,000, A$120,000, A$96,000, A$96,000 and A$48,000.
Quick facts
- Category: Legal & Government
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: QBCC, understanding deposits and progress payments; Domestic Building Contracts Act 1995 (Vic)
Frequently asked questions
What is the maximum deposit in NSW?
10% of the contract price.
What about Victoria and Queensland?
10% under A$20,000 and 5% for A$20,000 or more.
Does Victoria limit stage payments?
Yes, for new homes: base 20%, frame 25%, lock-up 20% and fixing 20%.
Should I pay before a stage is finished?
No, pay only when the stage is complete.
Can I get an independent inspection?
Yes, many owners use an inspector at each stage.
Is my data stored?
No. It stays in your browser.