Test Case Template and Tracker: Pass Rate and Coverage
Write test cases with steps, data, expected and actual results, priority and status, link them to requirements, and track pass rate and coverage.
Small teams often test by clicking around before a release and hoping nothing is broken. It works until a bug slips through in checkout and nobody can say what was tested. Written test cases fix that: they make checks repeatable and show exactly what passed. The free Test Case Template and Tracker gives you a proper template and a live summary of the run, with pass rate, progress and requirement coverage.
It runs in your browser. No account, no upload.
What each test case holds
| Column | Purpose |
|---|---|
| ID | A short reference such as TC-01 |
| Requirement | The feature or requirement it proves |
| Title | What is being checked |
| Steps | The actions to take |
| Test data | Exact inputs, such as a test card number |
| Expected result | What should happen |
| Actual result | What did happen |
| Priority | High, medium or low |
| Status | Not run, pass, fail or blocked |
At the top you also record the project and build, the tester and the environment.
How to run a test cycle
- Describe the run: project, build number, tester and environment.
- Write the cases with steps, data and an expected result.
- Link each case to a requirement.
- Run the cases on the build and record the actual result and status.
- Read the summary: pass rate, progress, failures and coverage.
- Fix and re-run the failures, starting with high priority.
How the numbers are worked out
Progress is the number of cases run, meaning any status except not run, divided by all cases. Pass rate is the number of passes divided by the cases run, so cases you have not reached yet do not drag it down. Blocked cases count as run but not passed. The coverage table groups cases by requirement: a requirement is "Covered and passing" only when every case passes, "Failing" if any case fails, and "Incomplete" otherwise. A gaps table lists cases with no expected result and failed cases with no actual result.
A worked example
The default run is for a shop checkout, release 2.4 (build 2418), tested by J. Mensah on staging with Chrome 130 and Android 15.
| ID | Requirement | Priority | Status |
|---|---|---|---|
| TC-01 | REQ-12 Pay by card | High | Pass |
| TC-02 | REQ-12 Pay by card | High | Fail |
| TC-03 | REQ-13 Discount codes | Medium | Pass |
| TC-04 | REQ-13 Discount codes | Low | Not run |
| TC-05 | REQ-14 Guest checkout | Medium | Blocked |
| TC-06 | REQ-15 Order email | Medium | Pass |
Five of the six cases have been run, so progress is 5 / 6 = 83%. Three passed, so the pass rate is 3 / 5 = 60%. There is one failure and one blocked case. TC-02, the declined card test, is a high-priority failure: the shop showed a generic error and emptied the cart, instead of a clear message. The summary flags it as a release risk. In coverage, REQ-15 is covered and passing, REQ-12 is failing, and REQ-13 and REQ-14 are incomplete. The gaps table is empty because every case has an expected result and the failure has its actual result recorded.
Writing cases that work
Each case should check one thing. Write steps someone new could follow, and give exact test data rather than "a valid card". The expected result must be specific: "Clear decline message, cart kept" can be judged; "works correctly" cannot. Record the actual result for every failed or blocked case, and link it to a bug report.
Blocked is not failed
A blocked case could not be completed because something else went wrong first, such as the payment page not loading for TC-05. Fix the blocker and run the case again; do not mark it as passed or skip it.
Use test data only
Use the payment provider's published test cards, dummy email addresses and made-up names. Never put real customer data or real card numbers in a test case.
Keeping the record
Print the run summary as a PDF or download the CSV with every column and keep it with the release notes. For the next build, duplicate the project, reset the statuses and run again, or add a second scenario for the retest.
Limits
This is a tracking aid, not a certified test process or a guarantee of software quality. Standards such as ISO/IEC/IEEE 29119 describe far more, including test planning, design techniques and reporting.
Frequently asked questions
Why is the pass rate only over cases run?
So the figure shows the quality of what you tested, while progress shows how much is left.
What is requirement coverage?
A table showing, for each requirement, how many cases it has and whether they pass.
Do blocked cases count as failures?
No, but they count as run and not passed, so they lower the pass rate.
Can I import cases from a spreadsheet?
You can export CSV and import or export the whole project as JSON from this tool.
What makes a high-priority failure?
Any case marked High that has the status Fail.
Final thoughts
The Test Case Template and Tracker turns release testing into a record you can read in one glance. Write clear cases, link them to requirements, record every actual result, and fix high-priority failures before you ship.