How to Plan a Project: Dependencies, Critical Path and Gantt Charts Explained
Plan a project in working days: break it into tasks, link dependencies, find the critical path and slack, read a Gantt chart and balance workload.

How to Plan a Project: Dependencies, Critical Path and Gantt Charts Explained
A project plan answers three questions: when will it finish, what decides that date, and who is overloaded. The Project Planner answers all three from a simple task list.
Break the project into tasks
List the work in pieces of a few days to two weeks. For each, estimate working days of effort and name an owner. Add milestones, zero-length checkpoints such as "Design approved" or "Launch".
Link dependencies
A dependency says task B cannot start until task A finishes: build after design, testing after build. Only add real constraints; every unnecessary link lengthens the plan.
The critical path
The planner runs the critical path method. A forward pass finds each task's earliest start; a backward pass finds the latest it can start without delaying the end. The difference is slack.
| Task | Duration | Slack |
|---|---|---|
| Requirements | 3 | 0 (critical) |
| Design | 5 | 0 (critical) |
| Build | 10 | 0 (critical) |
| Help pages | 4 | 11 |
| Testing | 5 | 0 (critical) |
The critical path, 23 working days here, sets the finish date. Speeding up the help pages changes nothing; shortening build does.
Read the Gantt chart
Bars show when each task runs, arrows show dependencies, red bars are critical, filled parts show progress and grey columns are weekends.
Balance the workload
Two overlapping tasks for one person can add up to more days than the week has. The workload view flags these weeks so you can reassign or reorder.
Keep the plan alive
Update status and progress weekly, adjust durations when you learn more, and watch the critical path: it can change as tasks slip. Export to your calendar so dates stay visible.
Work in small, saved steps
Every tool in this series keeps your work as a project in your own browser. Make a change, check the preview, and use undo (Ctrl+Z) or redo (Ctrl+Y) freely; nothing is lost while you experiment. Before a big change, save a named copy from the Projects menu, so you can return to it later or compare two versions side by side. Export the project file when you want to move it to another computer or keep a backup, and import it again whenever you need it.
Estimating durations
Estimates are the weakest part of any plan. Ask the person doing the work, estimate in working days of effort rather than calendar time, and add explicit buffer tasks near the end instead of padding every task. For uncertain work, estimate a best, likely and worst case and plan with something between the likely and worst values.
Communicating the plan
Share the timeline SVG in status updates, name the critical tasks, and report the finish date with its main risk. Stakeholders care less about every task than about what could move the end date.
Privacy by design
The processing happens in the page itself. Files you open are read by code running on your device, results are calculated locally, and nothing is sent to a server or stored in a cloud account. That makes the tool suitable for customer lists, financial data and other material you would not upload to an unknown website. If a component such as a file reader or a map outline is downloaded from a public CDN, only that open-source code or public data is fetched, never your own content.
Share the result clearly
When you pass the output to colleagues, say where the data came from, when it was exported, and which settings you used, so that someone else can repeat the work and get the same answer. Keep the original file unchanged and store the cleaned or calculated version separately. A short note with the assumptions, filters and date saves a lot of questions later and makes the result easier to trust.