How to Lay Out an Archaeological Excavation Grid
A step-by-step guide to setting up an archaeological site grid: datum, unit size, labelling, squaring corners with 3-4-5 triangles and estimating spoil.

How to Lay Out an Archaeological Excavation Grid
Before the first trowel goes in, an archaeological excavation needs a grid. It ties every find, feature and photograph to a precise location, so the site can be reconstructed long after it has been dug away. This guide explains how grids are planned and set out, and you can plan one with the excavation grid calculator.
Why a grid?
Excavation destroys the deposits it studies. The only way to preserve the information is accurate recording: where each object lay, in which layer and at what depth. A grid divides the site into named units, each with known coordinates, which makes recording consistent across a team and across seasons.
The datum
Everything starts from a datum point, a fixed marker whose coordinates are known. It may be tied to the national grid with GNSS or a total station, or it may be a local origin with arbitrary values such as E1000 N500, chosen so that all coordinates stay positive. A separate height datum gives elevations. Mark it permanently and photograph it.
Choosing a unit size
- 1 × 1 m: test pits and very detailed work.
- 2 × 2 m: common for training excavations and small sites.
- 5 × 5 m or more: large open-area excavations, often subdivided for recording.
Units may be separated by baulks, unexcavated strips that keep sections visible.
Naming units
Two systems are common:
- Letter and number: columns A, B, C from west to east, rows 1, 2, 3 from south to north. A unit reads "C2".
- South-west corner coordinates: each unit takes the coordinates of its south-west corner, like N504E1004. This is unambiguous and easy to extend, popular in North America.
Setting out square corners
- Stretch a baseline between two pegs along one axis.
- At a corner, use a 3-4-5 triangle: measure 3 m along the baseline and 4 m roughly perpendicular; adjust until the diagonal between these two points is exactly 5 m. Any multiple works, such as 1.2 m, 1.6 m and 2.0 m for a 2 m unit.
- Place pegs at each corner along the grid lines.
- Check: both diagonals of a square unit must be equal to its side × √2 (2.83 m for a 2 m unit).
On larger sites, a total station sets out corners directly from coordinates.
Labels and string lines
Label each peg with its coordinates or unit name. Run string lines between pegs to mark unit edges, set slightly above the ground so they do not catch tools.
Recording within units
Finds are recorded by unit and context, often with three-dimensional coordinates measured from the unit's corner or with a total station. Plans are drawn at 1:20 or 1:10 using planning frames aligned with the grid.
Estimating spoil
Excavated soil expands as it is loosened, typically by 20 to 30 % for topsoil and more for compacted clay. For 20 units of 2 × 2 m dug 0.5 m deep:
- excavated volume = 80 m² × 0.5 m = 40 m³,
- spoil at 25 % bulking = 50 m³.
Plan spoil heaps far enough from trench edges (at least 1 m, more for deep trenches), outside future excavation areas, and decide whether soil is sieved and kept separately for backfilling.
Safety
Deep trenches can collapse. Many guidelines require shoring, battering or stepping for trenches deeper than about 1.2 m. Keep spoil and machinery back from edges.
Using the calculator
- Enter the site width and length.
- Enter the unit size.
- Enter the datum coordinates.
- Choose the labelling system.
- Enter the depth and bulking factor to estimate spoil.
The calculator lists units with their corner coordinates, diagonals and a scaled 3-4-5 triangle.
Limits
This is a planning aid. Follow your excavation director's methods and the standards of your heritage authority.