Work Breakdown Structure (WBS) Maker
List deliverables, work packages and milestones, indent and outdent them to build the hierarchy, let the tool number them 1, 1.1 and 1.1.2, type hours, cost and owner on the lowest items, see the totals rolled up to every level, and download a tree chart or an outline in Excel.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Project
Name the project and currency.
- 2Deliverables
Add the top-level items.
- 3Break down
Add children until work packages remain.
- 4Estimate
Type hours, cost and owner on packages.
- 5Export
Download the tree or the Excel outline.
About this tool
The Work Breakdown Structure (WBS) Maker builds the deliverable-oriented hierarchy that project managers use to show the entire scope of a project before any scheduling begins. Every row is an item with a name and a level. The indent and outdent buttons move an item, together with everything below it, one level in or out, and the up and down arrows move it past its neighbour at the same level, again taking its children along. A child button inserts a new work package directly under an item, a delete button removes an item and its whole branch after asking you to confirm, and a top-level button starts a new branch at the bottom. Numbers are worked out from the order and the levels each time something changes, giving codes such as 2, 2.2 and 2.2.1, and a jump of more than one level is corrected so that a child can never sit two levels below its parent. The lowest items in each branch are the work packages. Only they show input boxes for type, effort in hours, cost, owner and notes or acceptance criteria. Type can be work package, deliverable or milestone, and milestones carry a diamond in the tree chart. Every item with children becomes a summary, and its effort and cost are the sum of everything beneath it, so the figures follow the 100 percent rule: the totals at the top equal the sum of the work packages. A line above the editor gives the number of items, total effort, total cost and the count of work packages.
Who this is for
Project managers setting up scope at the start of a project, team leads splitting a deliverable into packages that can be assigned and estimated, PMP and PRINCE2 candidates practising the WBS technique, and students who need a numbered breakdown for a project management course.
How to use it
1. Enter the project name and a currency symbol. 2. Add the main deliverables as top-level items. 3. Add children and indent them until each branch ends in work packages. 4. Type hours, cost, owner and notes on the work packages. 5. Check the tree chart and download the outline or the picture.
What the sample shows
The sample is a company website relaunch with 16 items across four deliverables: Discovery, Design, Build and Launch. Eleven of them are work packages or milestones, and the project totals 319 hours and £24,990. Design shows how a roll-up works through two levels. Visual design, numbered 2.2, has two work packages below it, Home page concepts at 32 hours and Template designs at 40 hours, so it shows 72 hours and £5,400. Add Information architecture at 20 hours and £1,500 and Design itself totals 92 hours and £6,900. Build is the largest branch at 155 hours and £12,150, mostly from Templates. Discovery report signed off and Go-live are milestones with no effort or cost.
Three views
Edit is the indented list with every control. Tree chart draws the project box at the top with its totals, one column for each top-level deliverable, and the items of that branch stacked below, indented by level. Summary boxes are light blue, work packages white and milestones yellow, and each box shows its WBS code with the rolled-up hours and cost. Outline is a flat table with WBS code, name, type, level, effort, cost, owner and notes.
Exports and saving
The outline downloads as an Excel XLSX workbook, CSV or JSON, with parents marked as summary. The tree chart downloads as PNG, SVG, a widescreen PowerPoint slide or a landscape print page. Every edit is autosaved in this browser, and Undo, Redo, named saves, Projects and JSON export and import are in the bar at the top.
Limits
Effort and cost are typed on the lowest items only and added up; a summary item cannot hold its own figure, so overhead has to be its own work package. Start and end dates are not entered here and there is no Gantt chart, critical path or resource levelling, so take the work packages into a scheduling tool for timing. Costs are shown rounded to whole units of your currency. This breakdown is a planning aid and is not project management, contractual or financial advice; agree the scope and estimates with the people who will do the work.
Worked example
Website relaunch sample: 16 items, 11 work packages, 319 hours and £24,990; Design rolls up to 92 hours and £6,900 from three packages.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: PMI Practice Standard for Work Breakdown Structures; 100% rule and work package roll-up
Frequently asked questions
What is the 100 percent rule?
It says a WBS should contain all the work of the project and nothing outside it, so each parent equals the sum of its children. The roll-up here applies that by adding up the work packages.
Why can I only type hours and cost on some rows?
Figures belong on work packages, the lowest items. Once an item has children it becomes a summary and shows the total of the items below it instead of an input box.
How does the numbering work?
Codes come from the order and level of the rows, so 2.2.1 is the first child of the second child of the second top-level item. Codes update at once when you move, indent or delete.
Can I move a whole branch?
Yes. The arrow and indent buttons always move an item together with all its children, and the delete button removes the branch after a confirmation.
Can I export the WBS to Excel or Project?
Press XLSX for a workbook with code, name, type, level, effort, cost, owner and notes. The same columns come as CSV, which most scheduling tools can import.
Does it make a Gantt chart?
No. This tool covers scope, effort and cost. Use the exported work packages as the task list in a scheduling tool to add dates and dependencies.