- 1Set the basis
Choose absorption or marginal costing, the price variance basis and the overhead hours.
- 2Build the cost card
Enter each material and labour grade with its standard quantity and price or rate.
- 3Enter actuals
Type quantities bought and used, hours paid and worked, and actual costs.
- 4Add overheads
Enter the variable overhead rate, budgeted fixed overhead and actual overheads.
- 5Review
Read each variance with its working and check the operating statement reconciles.
- 6Report
Print the variance report, export CSV or download the chart.
About this tool
Standard costing sets in advance what each unit should cost: so many kilograms of material at a standard price, so many labour hours at a standard rate, and overheads absorbed on those hours. At the end of a period the actual cost is compared with the standard cost of what was actually made, and the difference is split into variances that point to a cause. A price variance belongs to purchasing, a usage variance to production, a rate variance to wage negotiations and an efficiency variance to the shop floor. This calculator builds the full analysis taught in management accounting courses and used in monthly reporting. The cost card can hold several materials and several labour grades, so material and labour mix and yield variances are worked out when there is more than one. Labour hours paid and hours worked are entered separately to show idle time. Variable overhead is split into expenditure and efficiency, and fixed overhead into expenditure and volume, with volume further divided into capacity and efficiency. You can switch between absorption and marginal costing, take the material price variance on purchases or on usage, absorb overheads on labour or machine hours, and add sales price and volume variances. Each variance shows its formula, the numbers substituted and the result, and an operating statement reconciles the standard cost of actual output to the actual cost.
Reading the variances
A favourable variance (F) means the actual cost was lower, or revenue higher, than the standard allowed for the output achieved; adverse (A) means the reverse. Variances are signals for investigation, not verdicts: a favourable price variance from cheap, poor-quality material often shows up again as an adverse usage variance. Sub-analyses such as mix, yield, capacity and efficiency split a main variance into parts and are not added again, so the operating statement uses only the main variances. A flag marks any main variance above the percentage of standard cost you set as your investigation threshold.
Worked example
The first sample makes 1,100 units against a budget of 1,000. The standard card is 4 kg of steel at £3, 2 labour hours at £12, variable overhead £2 per hour and fixed overhead £10,000 ÷ 2,000 budgeted hours = £5 per hour, so £50 per unit and £55,000 for 1,100 units. 4,600 kg were bought for £14,260 (£3.10 per kg), a price variance of £460 A, and 4,500 kg were used against a standard of 4,400, a usage variance of £300 A. Wages were £28,750 for 2,300 hours paid (£12.50 an hour), a rate variance of £1,150 A; 50 hours were idle, £600 A, and the 2,250 hours worked against 2,200 standard give an efficiency variance of £600 A. Variable overhead shows expenditure £200 A and efficiency £100 A. Fixed overhead shows expenditure £400 A and volume £1,000 F, made up of capacity £1,250 F and efficiency £250 A. The total is £2,810 A, and £55,000 + £2,810 = £57,810, the actual cost.
Limits
The results are only as good as the standards; out-of-date standards produce variances that mean nothing. The calculation follows the common textbook conventions, which differ in places between syllabuses and companies, so check the definitions your organisation uses. This is a management accounting calculation, not financial, tax or audit advice.
Worked example
1,100 units at a £50 standard: material £760 A, labour £2,350 A, variable overhead £300 A, fixed overhead £600 F, total £2,810 A.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: CIMA Official Terminology (2005); ACCA Performance Management technical articles
Frequently asked questions
Should the material price variance be based on purchases or usage?
On purchases when stock is held at standard cost, which shows the price effect as soon as material is bought. On usage when stock is held at actual cost, which ties the variance to the period in which the material is consumed. The tool supports both.
What is the difference between mix and yield variances?
When several materials or grades can substitute for each other, the usage or efficiency variance can be split. The mix variance shows the cost of using a different blend from the standard proportions; the yield variance shows the cost of using more or less input in total than the output needed.
Why is there no volume variance under marginal costing?
Marginal costing does not absorb fixed overhead into units, so producing more or fewer units than budgeted does not change the fixed overhead charged. Only the fixed overhead expenditure variance is reported.
What is idle time?
Hours paid but not worked, for example waiting for material or a breakdown. It is valued at the standard rate and shown as a separate adverse variance, so the efficiency variance reflects only the hours actually worked.
Can I use machine hours for overheads?
Yes. Choose machine hours and enter the standard machine hours per unit and the actual machine hours. Overhead efficiency, capacity and absorption are then based on those hours instead of labour hours.
How do I get the report into a board pack?
Print the report or save it as PDF; it contains the cost card, every variance with its working and the operating statement. The variances CSV opens in a spreadsheet, and the chart downloads as SVG.