Stakeholder Power-Interest Grid Builder

List stakeholders with power and interest from 1 to 10 and see who to manage closely, keep satisfied, keep informed or monitor.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    List stakeholders

    One per line: name, power, interest.

  2. 2
    Score carefully

    Use 1 to 10 for each dimension.

  3. 3
    Read the grid

    See each quadrant's stakeholders and the table.

  4. 4
    Plan engagement

    Set communication for each quadrant.

About this tool

Projects and campaigns fail more often from ignored stakeholders than from technical problems. The power-interest grid, introduced by Aubrey Mendelow in 1991 and used throughout project management guidance such as the Project Management Institute's PMBOK Guide, is the simplest way to decide how to engage each group. Stakeholders are rated on two dimensions: power, their ability to influence the outcome, and interest, how much they care about it. The grid gives four strategies. People with high power and high interest are key players who must be managed closely and involved in decisions. Those with high power but low interest should be kept satisfied: consulted on what matters to them without overloading them. Those with low power but high interest should be kept informed and can become valuable allies. And those with low power and low interest should be monitored with minimal effort. This builder takes a list of stakeholders with scores from 1 to 10, places each in a quadrant (6 and above counts as high), lists the stakeholders by quadrant and produces a sorted table you can paste into a project plan or communications plan.

Who this is for

Project managers, change managers, PR and communications teams, non-profit organisers and students of management.

Quadrants

| Power | Interest | Strategy | |---|---|---| | High | High | Manage closely | | High | Low | Keep satisfied | | Low | High | Keep informed | | Low | Low | Monitor |

Scoring

Rate power by formal authority, control of resources, ability to block or speed up, and influence on others. Rate interest by how much the outcome affects them and how much attention they pay. Score together with the team to reduce bias.

Using the grid

- Plan communication frequency and channel for each quadrant. - Assign an owner for each key player relationship. - Watch for stakeholders moving between quadrants as the project progresses.

Beyond two dimensions

Some methods add attitude (supportive or opposed) or urgency (the salience model). Note these in the stakeholder register alongside the quadrant.

Communications plan

For each quadrant, set what you share, how often and through which channel: workshops for key players, briefings for those kept satisfied, newsletters for those kept informed.

Worked example

CEO (9, 7) is managed closely; the finance director (8, 4) and regulator (8, 3) are kept satisfied; the project team (4, 9) and customers (5, 8) are kept informed; suppliers (3, 3) are monitored.

Common mistakes

Teams often underestimate stakeholders with low formal power but strong informal influence, such as respected senior staff, community groups or the media. They also forget that interest can rise quickly when a project affects someone directly. Ask several people to score independently and discuss differences.

Linking to risk

Stakeholders who are powerful and opposed are a project risk. Add them to the risk register with an owner and a plan.

Keep it private

Stakeholder maps can be sensitive; share them only with the core team.

Limits

A planning aid, not official advice.

Worked example

CEO: manage closely; regulator: keep satisfied; customers: keep informed.

Quick facts

Frequently asked questions

What is a power-interest grid?

A matrix placing stakeholders by their power and interest to choose an engagement strategy.

Who created it?

Aubrey Mendelow, in 1991.

What does keep satisfied mean?

Meet the needs of powerful but less interested stakeholders without overloading them.

What score counts as high?

6 or more on a 1 to 10 scale in this tool.

Should the grid be updated?

Yes, stakeholders change position as projects progress.

Can I add attitude?

Note support or opposition alongside the quadrant.