Spaghetti Diagram Maker

Set the floor size and the metres per grid cell, tap to place workstations, tap them in order to trace a walking route, and see the distance along aisles or in straight lines, the steps and walking minutes per trip and per shift, with a current versus improved layout comparison and image or Excel export.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    Floor

    Set grid size, scale and walking speed.

  2. 2
    Stations

    Place each workstation on the plan.

  3. 3
    Trace

    Tap stations in route order.

  4. 4
    Improve

    Copy the layout and move stations.

  5. 5
    Compare

    Read the saving and export.

About this tool

The Spaghetti Diagram Maker records the walking that a person or a part does through a work area and measures it, so that motion and transport waste can be shown in metres rather than described in words. The floor is a grid whose width and depth you set from 5 to 60 cells, with a scale in metres per cell. Three tap modes work on the plan. Place a station asks for a name and puts a workstation on the nearest grid point. Move a station picks one up with a first tap and drops it with a second. Trace the route adds the station you tap to the end of the selected route, so a walk is recorded by tapping stations in the order they are visited. Each route has a name, a number of trips per shift and a colour, and a layout can hold several routes, each drawn as its own coloured line with an arrow. Undo last move removes the most recent stop and Clear route empties it. Distance can be measured in two ways. Along aisles adds the horizontal and vertical gaps between stations and draws right-angle paths, which is closer to walking between racks and machines; Straight lines uses the direct distance between centres. Grid distance is multiplied by the scale to give metres, steps come from dividing metres by your step length, and walking time from dividing metres by walking speed. Two layouts, current and improved, sit on separate tabs, and the improved one can start as a copy of the current one.

Who this is for

Lean and industrial engineers studying a work cell, warehouse and logistics supervisors looking at picking routes, hospital and laboratory managers checking how far staff walk, kaizen teams who want a before and after figure for motion waste, and students on lean or facility layout courses.

How to use it

1. Set the floor size, metres per cell, step length and walking speed. 2. Place each workstation on the current layout. 3. Trace the route by tapping the stations in order and enter trips per shift. 4. Copy the layout to the improved tab and move stations closer together. 5. Compare the walking per shift and download the plan and table.

What the sample shows

The sample is a small workshop on a 20 by 14 cell floor at 1.5 metres per cell, with one order flow that runs from Goods in through Store, Cutting, Drilling, Assembly and Inspection to Packing, 40 times a shift. On the current layout, measured along aisles, one trip covers 69 cells, or 103.5 metres: 138 steps at 0.75 metres and about 1.4 minutes of walking at 1.2 metres a second. Over 40 trips that is 4.14 kilometres and 5,520 steps a shift. The improved U-cell layout puts the same seven stations in sequence and shortens a trip to 36 metres and 48 steps, or 1.44 kilometres a shift. The comparison reports 65 percent less walking and about 38 minutes saved per shift. Measured in straight lines instead, the trips are 88.7 and 28.7 metres.

The comparison and table

The cards show kilometres and steps per shift for both layouts, the percentage saved and the walking minutes saved. The table gives, for every route on both layouts, the number of moves, metres, steps and walking minutes per trip, the trips per shift and kilometres per shift.

Exports and saving

The plan of the open tab downloads as PNG, SVG, a widescreen PowerPoint slide or a print page for PDF, and the distance table as CSV, XLSX or JSON. Everything is autosaved in this browser with Undo, Redo, named saves and JSON import and export.

Limits

Stations sit on grid points and distances are grid-based, so walls, doors and obstacles are not modelled and an along-aisles path may cross a machine on the drawing. Time is walking only and leaves out carrying, waiting and work at each station. Trips per shift are entered by you rather than counted. The figures support a layout discussion and are not engineering, health and safety or ergonomic advice; walk and time the real route before moving equipment.

Worked example

Workshop sample: 103.5 m and 138 steps per trip on the current layout, 36 m on the U-cell; 4.14 km against 1.44 km a shift, 65% less walking.

Quick facts

Frequently asked questions

What is a spaghetti diagram used for?

It traces the actual path of a person or product through a work area. The tangled lines show motion and transport waste and make a case for moving stations closer together.

Should I measure along aisles or in straight lines?

Along aisles is usually closer to reality on a shop floor or in a warehouse, because people walk around racks and machines. Straight lines suit open areas.

How are steps worked out?

Distance in metres is divided by the step length you enter, 0.75 metres by default. Measure a few real strides on site if you need a closer figure.

Can I trace more than one route on a layout?

Yes. Add routes with + Route, each with its own name, trips per shift and colour. The table and the per-shift totals include every route.

How do I compare a new layout?

Open the second tab, copy the current layout into it, then move stations and retrace if needed. The comparison cards show the percentage of walking saved.

Can I use a real floor plan image as the background?

Not in this version. Set the grid to the floor size and scale, and place stations at their measured positions on the grid.

Guides for this tool

Completely freeNo cost, no sign-up
Files stay privateEverything runs in your browser
Easy in your languageAvailable in many languages