Primavera P6 XER File Viewer

Open a Primavera P6 XER export to list activities with dates, durations, float, constraints and logic, see a Gantt chart and the WBS tree, run DCMA-style schedule checks and save the tables to Excel or CSV.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    Open

    Load the XER export.

  2. 2
    Critical

    Set the total float limit.

  3. 3
    Threshold

    Set high float and duration days.

  4. 4
    Review

    Read activities, Gantt and checks.

  5. 5
    Export

    Save Excel or CSV.

About this tool

The Primavera P6 XER File Viewer opens the XER files that Oracle Primavera P6 exports, so you can review a schedule when you do not have a P6 licence or a copy of the database. An XER file is a tab separated text dump of P6 tables: each table starts with a %T line, its field names follow on a %F line and every record is a %R line. The viewer reads all of those tables in your browser and builds a project view from the ones that matter for planning. From TASK it takes each activity's ID, name, WBS, type, status, dates, original and remaining duration, physical percent complete, total and free float and constraint. From TASKPRED it takes the relationships with their type and lag. Durations, float and lag are stored in hours, so each is divided by the hours per day of the activity's calendar, with 8 hours used when a calendar gives none. The Activities table shows all of this with predecessors written as, for example, A2020 FS or A3010 SS-1d, and a count of successors. The Relationships table lists each link with both activity names. The Gantt tab draws one bar per activity sorted by WBS and start date, with critical bars in red, others in blue, milestones as purple diamonds and a darker fill showing percent complete, over a grid of months. The Structure tab shows the project, its WBS levels and the activities inside them with their dates and total float. A Resources table lists each resource and the activities it is assigned to, and the XER tables list shows every table in the file with its field and row counts. The summary gives the project, the P6 version, the data date, the activity and relationship counts, the start and finish and the number of critical activities.

Who this is for

Planners and project controls staff checking a contractor's submission, clients and consultants who receive XER files but have no P6, claims and delay analysts reading an older update, and site managers who need the dates in a spreadsheet.

How to use it

1. Open the .xer file exported from P6. 2. Set the total float at or below which an activity counts as critical. 3. Adjust the high float and high duration threshold if your project uses another value. 4. Review the Activities, Gantt, Structure and Schedule checks tabs. 5. Download the Excel workbook or the activities CSV.

What the sample shows

The sample, depot-sample.xer, is project DEPOT-01 exported from P6 19.12 with a data date of 2026-11-16. It has 8 activities and 7 relationships running from 2026-11-02 to 2027-03-26, and 5 activities are critical. A2020 Foundations, in WBS 2.1, has an original duration of 50 days, a Must finish on constraint of 2027-02-26 and total float of -2 days, so it is drawn as a critical bar. A3010 Order steel frame has no predecessor, 50 days of total float and drives A3020 Erect frame through a start to start link with a lead of one day, while A3020 drives the handover milestone with a lag of two days. The planning permission activity is 40 percent complete. Every one of the eight checks finds 1 of the 6 incomplete activities or 1 of the 6 open relationships, 16.7 percent, so all eight are marked for review.

The schedule checks

Eight tests follow the DCMA 14-point assessment with its usual thresholds: missing logic at 5 percent, leads at zero, lags at 5 percent, relationships other than finish to start at 10 percent, hard constraints at 5 percent, total float above the high float limit at 5 percent, negative float at zero and durations above the limit at 5 percent. The default limit is 44 working days. They count incomplete activities only, leaving out level of effort and WBS summary activities, and relationships whose successor is not complete. Start milestones need no predecessor and finish milestones need no successor. Must start on, must finish on, mandatory start, mandatory finish, start on or before and finish on or before count as hard constraints.

Which dates are shown

For each activity the start is the actual start when there is one, else the remaining early start, else the early start, else the planned start, and the finish follows the same order. The Excel workbook holds the activities, relationships and checks plus up to 25 of the raw XER tables, each on its own sheet.

Limits

The viewer does not reschedule: float and dates are the values P6 calculated before the export, so they are only as current as the last scheduling run. Only eight of the fourteen DCMA tests are run, and holidays and calendar exceptions are not applied. Agree thresholds with your client before quoting results, because the checks are an aid, not scheduling, contractual or claims advice.

Worked example

depot-sample.xer: 8 activities, 7 relationships, 2026-11-02 to 2027-03-26, 5 critical; each of the 8 checks finds 1 of 6 (16.7%).

Quick facts

Frequently asked questions

Can I open an XER file without Primavera P6?

Yes. Open the file here and the activities, relationships, WBS, resources and every raw table are read in your browser without P6 or a database.

How is the critical path decided?

An activity that is not complete is marked critical when its total float is at or below the value you set, which is 0 days by default.

Are the dates recalculated?

No. The tool shows the dates and float stored in the file, choosing actual dates first, then early dates, then planned dates.

What are the schedule checks based on?

They follow eight of the DCMA 14-point tests, such as missing logic, leads, lags, hard constraints and high or negative float, using the common thresholds.

Why are durations shown in days when P6 stores hours?

Each value in hours is divided by the hours per day of the activity's calendar, which gives working days like those shown in P6.

Can I get the schedule into Excel?

Yes. The workbook has sheets for activities, relationships and checks, plus the raw XER tables, and a CSV of the activities is also offered.