Owner Builder Permit and Cost Planner

Pick your state, list the budget trade by trade, mark the work that needs a licensed trade, add a contingency and see whether a permit and course are needed and how long selling rules last.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    State

    Choose the state and enter the expected completion date.

  2. 2
    Budget

    List each trade with its cost.

  3. 3
    Licensed

    Mark the rows that need a licensed tradesperson.

  4. 4
    Contingency

    Set the contingency percentage for overruns.

  5. 5
    Check

    Read the permit, course and selling results and print.

About this tool

Taking on a renovation or extension as an owner builder means you carry the duties a registered builder would normally hold, and every state sets a value above which you need its approval first. The Owner Builder Permit and Cost Planner puts the money and the paperwork side by side. You choose one of five states (Victoria, NSW, Queensland, Western Australia or Tasmania), name the project, enter an expected completion date and set a contingency percentage, which starts at 15%. The budget is a table of trades, each with a cost and a column that asks whether the item must be done by a licensed trade. The planner adds the trade costs, works out the contingency on that sum and shows the total with contingency as the main figure. It then compares the trade total, without the contingency, against two thresholds stored for your state: the value above which an owner builder permit or approval is needed, and the value above which an approved course is needed. Victoria is set at $16,000 for both, NSW at $10,000 for the permit and $20,000 for the course, Queensland at $11,000, and Western Australia and Tasmania at $20,000. Each state also has a number of years during which selling the home carries extra obligations: 6.5 years for Victoria and Queensland, 6 for NSW and Tasmania, and 7 for Western Australia. The planner adds that period to your completion date and shows the month it ends. These thresholds and periods sit in the code as examples drawn from the regulators named in the source line; they change, so check the VBA, NSW Fair Trading, QBCC, the WA Building Services Board or CBOS before you apply.

Who this is for

Home owners planning an extension, a new bathroom or a granny flat who want to manage the trades themselves, and people comparing whether owner building is worth the extra responsibility against hiring a builder.

The sample extension

The default project is a two-bedroom extension with a new bathroom in Victoria, finishing on 30 September 2027. Twelve budget lines run from plans, engineering and permits at $9,500 to a kitchen and bathroom fit-out at $21,000, with framing and carpentry the largest trade at $27,600. They add up to $145,900. A 15% contingency is $21,885, so the total with contingency is $167,785. Because $145,900 is above $16,000, the planner reports that a certificate of consent from the VBA is needed and that the course is needed. The selling restriction runs to about 30 March 2034, which is 6.5 years after completion.

Switching states

The NSW tab keeps the same budget and shows a NSW Fair Trading owner-builder permit and a course as needed, with the selling period ending about 30 September 2033. The Queensland tab shows a QBCC permit and an end date of about 30 March 2034. Duplicate a tab and pick Western Australia or Tasmania if you are building there. A note under the results repeats the stored rule for the chosen state in a sentence, such as the need for a defects report and domestic building insurance if a Victorian owner builder sells within 6.5 years.

Licensed trade checklist

Every budget line marked Yes appears in a second table with a reminder to use a licensed tradesperson and collect the compliance certificate. In the sample that is electrical at $11,800, plumbing and drainage at $14,900 and waterproofing at $2,400. Add gas fitting, air conditioning or any other licensed work as rows so it shows up on the list.

Comparing, saving and printing

Compare all lays the KPIs for every tab next to each other, which is handy when you are deciding between two states or two versions of the budget. Projects live in this browser, can be exported and imported as JSON files, and Print / PDF report gives a copy of the budget and checklist for a lender or a family meeting.

Limits

The planner compares the trade total with the threshold and ignores the contingency in that test, so a budget just under a threshold may still need a permit once costs rise. Course rules differ from permit rules in several states and are simplified to one value. The 7-year selling period stored for Western Australia does not match the 6 years in its own note and needs checking with the Building Services Board. It does not cover the Northern Territory, South Australia or the ACT, council approvals, insurance premiums, or the limit on how often you can be an owner builder. Thresholds and periods are examples, and the result is a planning aid, not legal advice.

Worked example

Victorian extension, 12 trades totalling $145,900 plus 15% contingency: $167,785 with a certificate of consent and course needed and selling rules until about 30 March 2034.

Quick facts

Frequently asked questions

Does the contingency count towards the permit threshold?

No. The planner tests the sum of the trade rows against the state value and shows the contingency separately. If your quotes rise, check the threshold again.

Which states are included?

Victoria, NSW, Queensland, Western Australia and Tasmania. Each has an example permit value, course value, selling period and regulator name stored in the code.

What does the selling restriction date mean?

It is your completion date plus the stored number of years for the state. During that time selling usually needs extra steps, such as warranty insurance, a defects report or a notice to buyers.

How do I add a licensed trade?

Add a row to the budget table and set the licensed column to Yes. It then appears in the licensed trade checklist with a reminder to get the compliance certificate.

Are the thresholds current?

They are examples. Look up the current figure on your state regulator's owner builder page before you apply, because values and course rules are revised.

Can I compare owner building with using a builder?

Duplicate the tab and change the rows to a builder's quote and margin. Compare all then shows both totals side by side.