Kaizen Event Planner and Report
Set the scope and team of a rapid improvement event, enter before and after figures for each metric and see the percent change in green or red, plan each day, track the open actions with owners and due dates and print a report-out with a before-and-after page.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Scope
Set the event, area, dates, leader and objective.
- 2Team
List the team members or roles.
- 3Metrics
Enter before values and which way is better.
- 4Plan
Plan each day and add after values.
- 5Report
List open actions and print the report-out.
About this tool
The Kaizen Event Planner and Report covers a short, focused improvement event, usually three to five days, from the first scope agreement to the report given to managers at the end. Event and scope holds the event title, the area, the first day, the number of days, the kaizen leader, the sponsor and a scope and objective statement; these print as the report heading with dates formatted in full. Team takes one member per line, which can be names or roles. Before and after is a metrics table with the metric name, unit, before value, after value and whether lower or higher is better. The report works out the change as a percentage of the before figure and prints it in green when the movement is in the better direction and in red when it is not, so a fall in walking distance shows green while a fall in output would show red. Daily plan is a table of day and activities, and Action list is a table of the follow-up actions that stay open after the event, each with an owner, a due date and a status of Open or Done. A check flags any open action whose due date has passed, which is the usual way kaizen gains fade. The last section, Before and after notes, can be included or switched off with a tick box. It prints a two-panel page with dashed photo frames labelled Before and After and your description of each photo under the frame, ready for printed photos to be stuck on or for you to replace in the Word file.
Who this is for
Continuous improvement leads and lean facilitators running kaizen blitz events, operations and warehouse managers sponsoring them, team members who need a record of what changed, and trainers who want a realistic example for a lean course.
How to use it
1. Enter the title, area, dates, leader, sponsor and objective. 2. List the team. 3. Add each metric with its unit, before value and whether lower or higher is better. 4. Plan the activities for each day and record the after values at the end. 5. List the open actions, describe the photos and print the report.
What the sample shows
The sample is a packing cell layout kaizen in packing, warehouse B, starting November 16, 2026 and running for 3 days, led by S. Lee and sponsored by the logistics manager. The objective is to cut walking and searching so one packer can pack 20% more orders per hour. The team is the leader, two packers from each shift, a maintenance technician and the warehouse supervisor. Orders packed per hour per packer rose from 22 to 28, printed as +27% in green. Walking per order fell from 34 m to 9 m (-74%), floor space from 48 m² to 36 m² (-25%) and mis-packs per week from 6 to 2 (-67%), all green because lower is better. Day 1 is training and observation with a spaghetti diagram and time studies, day 2 tries a cardboard mock-up of the new layout and day 3 writes standard work and reports out. Two actions remain open after the event: a label printer shelf at eye height, due 2026-11-27, and the night shift standard work sheet, due 2026-11-24.
Saving and downloads
The plan and report are one document, kept in this browser, so you can draft the plan before the event and add the after values on the last day. Save version before the report-out keeps the version that managers saw. Print / PDF, Word (.doc) and Web page (.html) are available.
Limits
Photos cannot be uploaded: the before-and-after page has empty frames and text descriptions only. There is one template, and the percentage change is a simple comparison with the before figure, so a metric whose before value is 0 shows the change in its own units instead of a percentage. The figures are what you type; the report does not check how they were measured, and a three-day result is a first reading, not proof that the change will hold. This tool is a planning and reporting aid, not engineering or management advice.
Worked example
Packing cell kaizen, 3 days: orders per hour 22 to 28 (+27%), walking per order 34 m to 9 m (-74%), floor space -25%, mis-packs -67%, 2 open actions.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: Lean kaizen (rapid improvement event) practice
Frequently asked questions
What is a kaizen event?
A short, structured improvement workshop, often three to five days, where a cross-functional team studies one process, tries changes on the spot and reports the results to management at the end.
How is the percent change worked out?
After minus before, divided by before, times 100, rounded to a whole number. It is green when the metric moved in the direction marked better and red when it moved the other way.
Can I add my own metrics?
Yes. Add rows to the metrics table with any name and unit, and set Better when to Lower or Higher so the colour of the change is right.
What happens to actions after the event?
They stay on the action list with an owner, due date and status. A warning appears when an open action passes its due date, which helps the sponsor follow up at the 30-day review.
Can I leave out the before-and-after page?
Yes. Untick Include on the Before and after notes section and it is left out of the preview, the printout and the downloads.
Can I insert the photos?
Not in this tool. Print the page and stick the photos into the frames, or download the Word file and replace the frames with your pictures in Word.