Job Costing Sheet for Manufacturing and Projects

Build a cost sheet per job with estimated and actual quantities and rates, absorb overhead on labour hours, machine hours or a percentage, set a price from a target margin and see price and usage variances line by line.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    Open a job

    Create a job, enter the customer, quantity, dates and description, or start from the sample.

  2. 2
    Set the overhead rule

    Pick the absorption basis, enter the rate from your budget and the administration uplift.

  3. 3
    Enter the estimate

    Add materials, labour, machine, subcontract and expense lines with estimated quantities and rates.

  4. 4
    Price the job

    Type the price or press the target margin button to work it out from the estimated cost.

  5. 5
    Record actuals

    As the job runs, fill in actual quantities and rates from timesheets and invoices.

  6. 6
    Review and print

    Read the variances and warnings, compare jobs in the register and print the cost sheet.

About this tool

Job shops, fabricators, joiners, printers, engineering contractors and agencies all sell work that is different every time, so a single product cost never tells them whether a job made money. Job costing does: each order collects its own direct materials, direct labour, machine time, subcontract work and direct expenses, then takes a fair share of the factory overhead through a pre-determined absorption rate. This editor keeps an estimate column and an actual column side by side for every line, so the quote you sent and the cost you incurred sit on the same sheet. It works out prime cost, production cost, an administration and selling uplift, total cost, cost per unit, margin on price and markup on cost, and it splits every line's difference into a price (rate) variance and a usage (efficiency) variance. Several jobs live in one register with a margin chart, and each job prints as a tidy cost sheet you can file with the order or attach to an invoice query.

How overhead absorption works here

Overhead such as rent, supervision, power and depreciation cannot be traced to one job, so it is charged with a rate set before the year starts: budgeted overhead divided by budgeted activity. Choose one of four bases. A rate per direct labour hour suits labour-heavy work such as welding and assembly. A rate per machine hour suits CNC, laser and press work. A percentage of direct labour cost is quick when wage rates are similar across the shop. A percentage of prime cost spreads overhead over materials as well, which some project businesses prefer. The same rate applies to the estimate and to the actual hours, so extra hours on the floor also absorb extra overhead, just as they would in your management accounts.

Reading the variances

For each line the tool compares actual cost with estimate and splits the gap. The price variance is the actual rate minus the estimated rate, times the actual quantity: it shows that steel cost more per kilo than quoted. The usage variance is the actual quantity minus the estimated quantity, times the estimated rate: it shows that the job used more kilos or more hours than planned. The two always add up to the line total. Adverse figures are marked A and shown in red, favourable figures are marked F. For a company-wide view with standard costs and fixed overhead volume variances, the standard costing variance calculator on this site goes further.

Worked example

The sample job J-1042 is 50 stainless brackets for a pump maker, priced at £6,200. The estimate is £1,068 of materials, 48 labour hours costing £1,134, machine time of £505, £420 of subcontract electropolishing and £85 of carriage. Overhead at £18 per labour hour adds £864, production cost is £4,076, and a 10% administration uplift brings the estimated total to £4,483.60, a margin of £1,716.40 or 27.68% of the price. The actual sheet shows 228 kg of steel at £5.10 instead of 210 kg at £4.80, so steel alone has a price variance of £68.40 adverse and a usage variance of £86.40 adverse. Welding took 47 hours instead of 42, an extra £120 of labour, and the four extra labour hours absorb £72 more overhead. Actual total cost is £4,962.98, which is £99.26 a unit, and the margin falls to £1,237.02 or 19.95%. The check panel warns that actual cost is 10.69% over the estimate. Pressing "Price from target margin" on the estimate gives £5,978.13 for a 25% margin.

Limits

This is a management costing record, not statutory accounts, tax advice or a substitute for your accountant. It does not post to a ledger, track stock or read timesheets; you type or import the quantities. The overhead rate is only as good as the budget behind it, and under- or over-absorption at year end must still be dealt with in the accounts.

Worked example

Job J-1042: estimate £4,483.60 (27.68% margin on £6,200); actual £4,962.98, margin £1,237.02 (19.95%); steel price variance £68.40 A and usage £86.40 A.

Quick facts

Frequently asked questions

What is a job costing sheet?

It is a record of every cost charged to one order or project: materials, labour, machine time, subcontract work, expenses and absorbed overhead. Comparing it with the selling price shows the real margin on that job.

How do I work out my overhead absorption rate?

Divide the overhead you budget for the year by the activity you budget, for example £207,000 of production overhead over 11,500 direct labour hours gives £18 an hour. Use machine hours instead if the machines drive your costs.

What is the difference between margin and markup?

Margin is profit as a share of the selling price; markup is profit as a share of cost. A job that costs £75 and sells for £100 has a 25% margin and a 33.3% markup. The tool shows both.

Can I use it for quotes before the job starts?

Yes. Fill in the estimate columns, set the target margin and press the price button. "Copy as new quote" duplicates an earlier job with the actual columns cleared, which is a fast way to quote repeat work.

Can I import lines from a spreadsheet?

Save a CSV with columns kind, description, unit, est qty, est rate, actual qty and actual rate. Kind can be materials, labour, machine, subcontract or expenses. The same format comes out of the Lines CSV button.

Where is my data stored?

Only in this browser. Use Export file to keep a backup or move the register to another computer; nothing is uploaded to a server.