Flat Purchase Due Diligence and Handover Snag List
A document checklist for buying a flat from a developer and a room-by-room snag list with photos for the handover inspection, printed in Bangla or English.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Enter the flat
Type the project, developer, flat number, floor, size and buyer, and set up the rooms.
- 2Check the documents
Mark each document OK, problem or not needed with dates and references.
- 3Walk the flat
Add a snag for each defect with room, category, severity and a short description.
- 4Add photos
Attach a photo to each snag so the developer sees exactly what is wrong.
- 5Assign and date
Enter who fixes each snag and the due date, and mark them fixed on the next visit.
- 6Print the report
Print the snag list with or without photos in Bangla or English for both sides to sign.
About this tool
Buying an apartment from a developer in Dhaka or Chattogram means trusting two sets of papers you rarely see: the land owner's title and the joint venture agreement that lets the developer sell flats, and the RAJUK (or CDA) approval that decides how many floors may stand. Then, years later, comes handover day, when a buyer has an hour to spot leaking pipes, hollow tiles and loose sockets before signing. This tool covers both. The documents tab is a bilingual checklist in four groups: land and developer (deed, mutation, registered joint venture agreement and power of attorney, whether your flat falls in the developer's share, REHAB membership, no mortgage), approval and building (approved plan and permit for the floors being built, your flat's size and position on the plan, structural design, fire safety), agreement and payments, and handover (occupancy certificate, separate meters and utility bills, measured area, car parking, registered deed with the undivided land share, mutation, keys and warranties). The snag list tab records each defect with its room, category, severity, a photo, who fixes it, a due date and its status.
Rooms and severity
Rooms start with a typical three-bedroom layout and can be renamed, added or removed. Snags are minor, major or safety; a safety snag such as a missing earth wire, a gas leak, a loose railing or a structural crack is shown in red and the report warns against taking possession while one is open.
Photos
Each snag can carry one photo, shrunk to about 640 pixels so a few dozen fit in the browser's storage. The report can print with or without photos.
Follow-up visits
After the developer's agreed date, go back with the list, mark snags fixed or accepted as they are, and print the updated list for both sides to sign.
Limits
The tool organises your checks; it is not a legal opinion or an engineer's survey. It cannot tell whether a RAJUK approval is genuine or a crack is structural. Have a lawyer read the agreements and a structural engineer look at serious cracks. Very many photos can fill the browser storage, so save the project file.
Worked example
For flat 5B (1,350 square feet) in Shapla Tower the buyer marks 12 of 19 documents OK; the occupancy certificate and the registered deed are still open. The inspection finds four snags: a leaking basin waste pipe in the master toilet (major), a hairline crack above the balcony door (minor), no earth wire at the kitchen oven socket (safety) and a balcony floor that slopes towards the room (major). The report shows 4 open, 1 safety and 2 major, by room, with photos, and both sides sign it.
Quick facts
- Category: Home & Life
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: Real Estate Development and Management Act 2010 and RAJUK approved plans; your sale and joint venture agreements
Frequently asked questions
Which documents matter most when buying a flat?
The land title and mutation in the land owner's name, the registered joint venture agreement and power of attorney, and the RAJUK approved plan for the number of floors being built. Without them the developer may not be able to give you a clean deed.
How do I know my flat is in the developer's share?
The joint venture agreement lists which flats go to the land owner and which to the developer. Ask to see that schedule and check your flat number against it.
What is an occupancy certificate?
It is the certificate the development authority issues after construction, confirming the building was built to the approved plan and may be used. Ask whether it has been applied for or issued.
What should a snag list include?
Every visible defect: cracks, uneven tiles, doors that stick, missing fittings, leaks, damp, electrical faults and paint. Note the room, take a photo and agree who fixes it by when.
Can I share the list with the developer?
Print it or save it as a PDF, or export it to Excel. The project file keeps photos and can be opened again on your own device.
Are my photos uploaded?
No. Photos are shrunk and stored in this browser only, and included in the project file when you save it.