Equipment Maintenance Work Orders
Raise and track maintenance jobs with checklists, parts and labour costs, schedule repeat preventive tasks and see downtime and cost by asset.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Set labour rate
Enter the hourly cost in Settings.
- 2Raise orders
Add asset, task, type and priority.
- 3Add checklists
Write steps and assign a technician.
- 4Work the board
Move jobs through the statuses.
- 5Close out
Record parts, hours, downtime and completion.
- 6Review
Check downtime and cost by asset.
About this tool
When a machine breaks down, production stops, and when maintenance lives on scraps of paper, nobody can see which equipment keeps failing. This tool is a simple maintenance management system for workshops, small factories, restaurants, schools, gyms and property managers. Raise a work order for any asset with its location, type (preventive, corrective after a breakdown, inspection, safety or improvement), priority and task. Write a checklist of steps and tick them off by starting a line with [x]; the table shows progress such as 2/3. Assign a technician, track the status from Open through Scheduled, In progress and Waiting for parts to Done, and record due and completion dates, parts with their cost, labour hours and downtime. For preventive tasks, set a repeat interval in days and the next occurrence is scheduled from the completion date. The Board tab shows all jobs by status, the due list combines open deadlines with upcoming preventive tasks and exports to your calendar, and the summary shows downtime, breakdowns and cost per asset and per month. Insights point out assets with repeated breakdowns and late jobs. Print a work order with checklist boxes and signature lines, attach photos, or export the full report, all stored in your browser.
Who this is for
Maintenance technicians, facilities and operations managers, workshop owners, landlords and anyone responsible for keeping equipment running.
Work order types
| Type | Purpose | |---|---| | Preventive | Planned servicing on a schedule | | Corrective | Repair after a breakdown | | Inspection | Checking condition or compliance | | Safety | Statutory or safety checks | | Improvement | Upgrades and modifications |
Preventive versus reactive
Planned maintenance costs less than emergency repairs because it happens at a convenient time, with parts ready and without lost production. A common goal is for most maintenance hours to be preventive. The stats show your preventive share so you can see whether you are moving out of firefighting mode.
Measuring downtime
Recording the hours each asset is out of action shows where breakdowns really hurt. An asset with frequent or long downtime may need more frequent servicing, spare parts kept on site or replacement.
Checklists
Standard checklists make sure every service is done the same way, whoever does it. Write each step on its own line and add [x] at the start when done. The printed work order shows empty boxes for paper use on the shop floor.
Worked example
Packing line 2 broke down twice in two weeks, with 5 and 8 hours of downtime, so the insights suggest more preventive work. The air compressor's quarterly service, completed 38 days ago with a 90-day interval, is scheduled again in 52 days.
Limits
This is a lightweight tool for small teams, not a full computerised maintenance management system. Follow manufacturers' manuals and statutory inspection rules. Data stays in your browser.
Worked example
Packing line 2: 2 breakdowns, 13 hours downtime; compressor PM repeats every 90 days from completion.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: Preventive maintenance practice; ISO 55000 asset management overview
Frequently asked questions
How do preventive schedules work?
Set Repeat every in days; when the order is done the next one is scheduled from the completion date.
How do I tick checklist steps?
Start a line with [x] when the step is done; progress appears in the table.
Can I record parts costs?
Yes, list parts as part = cost lines; labour uses the hourly rate in Settings.
Can technicians use a board?
Yes, the Board tab shows jobs by status and lets you move them.
Can I print work orders?
Yes, with checklist boxes and signature lines.
Where is data kept?
Only in this browser; export backups to share.