Construction Punch List with Photos
Record snags room by room with photos, assign them to trades, track them to closed and print a punch list for handover sign-off.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Set up
Enter the project name and sign-off parties.
- 2Walk the job
Add items by room with photos.
- 3Assign
Choose trade, company, priority and due date.
- 4Track
Move items along the board.
- 5Check and close
Inspect fixes and add after photos.
- 6Sign off
Print the punch list for handover.
About this tool
At the end of a building or renovation job, the punch list, called a snag list in the UK, records every defect and unfinished item that must be fixed before handover. Done on paper, items get lost, photos are separated from notes and nobody knows who is responsible. This tool keeps the whole list in one place. Walk the job with a phone and add each item with the room or area, trade, issue and markup notes, priority (must fix before handover, fix soon or cosmetic), the company it is assigned to, the date raised and a due date. Attach before and after photos. Items move from Open through In progress and Ready for check to Closed, or Disputed, on a board, and late items are flagged. Stats show the number of items, the percentage closed, open must-fix items, items ready for checking and late items. The summary groups items by room and by trade with open and late counts, and insights list the trades with the most open items. The due list exports deadlines to your calendar. Print an individual item sheet for a subcontractor, or the full punch list with photos for the client's sign-off at handover, or export CSV. Everything stays in your browser.
Who this is for
Builders, site managers, renovation contractors, architects, clients inspecting a new home and property managers checking work.
Priorities
| Priority | Typical items | |---|---| | Must fix before handover | Safety, services not working, water leaks, doors that do not lock | | Fix soon | Cracked tiles, sticking doors, missing trims | | Cosmetic | Paint touch-ups, minor marks, cleaning |
Walking the job
Go room by room in a fixed order, checking walls, ceilings, floors, doors, windows, fixtures and services. Test every socket, switch, tap and appliance. Photograph each item with something that shows its location, and write a clear, specific description such as “Two sockets dead by island”, not “electrics”.
Closing items
When a trade says an item is fixed, mark it Ready for check, inspect it and then close it with an after photo. This avoids arguments about whether work was done.
Sign-off
At practical completion, the client or their representative signs the list to confirm which items are complete and which remain. Set the sign-off parties in Settings.
Worked example
A kitchen and bathroom renovation has four items. Two sockets by the island are a must-fix for the electrician, due in three days. A cracked bathroom tile was due yesterday, so it is late. Paint drips are in progress, and a door rubbing on its frame is closed, giving 25% closed.
Limits
A punch list does not replace contractual inspections or certificates. Photos are stored in the browser; back up the list before clearing browser data.
Worked example
4 items: 1 closed (25%), 1 must-fix open for the electrician, 1 late tiling item.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: Construction snagging and punch list practice at practical completion
Frequently asked questions
What is a punch list?
A list of defects and unfinished work to fix before handover, also called a snag list.
Can I add photos to each item?
Yes, before and after photos are stored in your browser and printed in reports.
Can I group items by trade?
Yes, the summary shows open and late items by trade and by room.
Can subcontractors get their items?
Print item sheets or filter by searching for their company name and print the report.
Is there a sign-off sheet?
Yes, the full report can be printed for handover, and item sheets have signature lines.
Does it need internet on site?
No, it works offline once loaded.
