Community Garden Plot Manager

Draw the site plan, give each plot a tenant, work out fees from plot size with concessions and missed work hours, and offer vacant plots to the waiting list in order.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    Set up the site

    In Site and fees enter the garden name, site size, currency and fee rules.

  2. 2
    Draw the plots

    On Plot map add plots, drag them into place and set exact sizes and labels.

  3. 3
    Add members

    In Members add names, contacts and joining dates and tick concession where it applies.

  4. 4
    Let the plots

    Select a plot and choose its member, or set it to vacant, reserved or unusable.

  5. 5
    Log work days

    In Work days add each session with its hours and tick who attended.

  6. 6
    Collect fees

    In Fees record payments and copy reminders for members who still owe.

  7. 7
    Fill vacancies

    Keep the Waiting list up to date and assign vacant plots in order.

About this tool

Garden committees often keep the plot map on a laminated sheet, fees in a notebook and the waiting list in someone's inbox. This manager brings them together. You draw the site to scale and drag rectangular plots into place on a half-metre grid, label them and mark each one as let, vacant, reserved or unusable. Members are linked to their plots, and fees follow a clear rule: a base charge per plot plus a price per square metre, a percentage off for concessions, and a charge for each missed work-party hour below the season's requirement. Work days record who came and for how long. The waiting list is kept in date order, and when a plot falls vacant the manager names the first person whose size wish fits, ready to be offered the plot or assigned in one step.

Who this is for

Allotment associations, community garden groups, school and church gardens, housing estate growing projects and anyone letting raised beds to members. Records stay in this browser and can be saved as a file, which is a sensible way to pass the job to the next secretary.

The plot map

Set the site width and length in metres, then add plots. Drag a plot to move it; it snaps to a 0.5 m grid and stays inside the site. Exact position, width and length can be typed for each plot. Colours show the status: green for let, amber for vacant, blue for reserved and grey for unusable areas such as a shed or water butt. When two plots overlap, both get a red dashed edge so mistakes in the plan show up at once. The first name of the tenant appears on each let plot.

Fees, concessions and work hours

Set the rules once in Site and fees: base fee per plot, fee per square metre, concession discount in percent, work hours required per season and the charge per missed hour. For each member the manager adds the fees for all their let plots, counts hours from the work days of that season, and adds the missed-hour charge for any shortfall. The Fees tab then shows what is due, what has been paid and what is still owed, with a button to record payments and one to copy polite reminders.

Worked example

With a base fee of £15, £0.60 per m², 50% concession, 6 required hours and £8 per missed hour, a 5 × 10 m plot of 50 m² costs 15 + 0.60 × 50 = £45. Hannah came to the 3-hour spring clear-up and the 2-hour path weeding, so she has 5 hours and is 1 short: she owes £45 + £8 = £53, and after paying £45 has £8 left to pay. Bea holds a concession, so her plot costs £22.50; with no work hours she is 6 short and owes 22.50 + 48 = £70.50.

Work days and the waiting list

Each work day has a date, a title, a length in hours and tick boxes for the members who attended. The waiting list is ordered by the date people joined and records a contact and a preferred plot size, with 0 meaning any size. Selecting a vacant plot on the map shows who is next for it, with buttons to mark the plot as offered or to accept and assign, which creates the member, removes them from the list and lets the plot.

Limits

The map uses rectangles only, so curved beds and paths are approximated. Fees follow one rule set for the whole site; special deals must be handled as a separate payment note. The manager does not process payments or send e-mails, and tenancy agreements and rules remain documents you keep separately.

Worked example

50 m² plot: £15 + £0.60 × 50 = £45; 1 work hour short adds £8, so £53 is due.

Quick facts

Frequently asked questions

How is a plot fee calculated?

Base fee plus the price per square metre times the plot area. Concession members get the set percentage off, and missed work hours below the requirement are charged on top.

Can one member rent two plots?

Yes. Assign the same member to several plots and their fee adds the charges for each let plot, with the area shown in the Fees tab.

How does the waiting list choose who gets a plot?

It is ordered by the date people joined. For a vacant plot, the first person whose size preference fits that plot is shown as next, and people already offered a plot are skipped.

Can I print the site plan?

Yes. Print map and list prints the drawn map with a table of plots, sizes, status, tenants and fees for the season.

What happens when a member leaves?

Remove the member and their plots become vacant automatically, ready to be offered to the next person on the waiting list.

Are work-day hours per season?

Yes. Hours count only from work days whose date falls in the season you set in the Fees tab, such as 2026, so each year starts fresh.

Guides for this tool

Completely freeNo cost, no sign-up
Files stay privateEverything runs in your browser
Easy in your languageAvailable in many languages