Bow-Tie Risk Diagram Maker

Enter the hazard and top event, add threats with preventive barriers and consequences with mitigating barriers, rate each barrier, and the tool draws the bow-tie with a barrier register and review checks.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    Name the hazard and top event

    Describe the hazard as it exists in normal work and the moment control is lost.

  2. 2
    Add threats

    List the credible causes on the left, one per branch.

  3. 3
    Add preventive barriers

    Put the barriers on each threat line in the order they act, with owner and type.

  4. 4
    Add consequences and mitigation

    List outcomes on the right and the barriers that limit each one.

  5. 5
    Rate the barriers

    Mark effectiveness, escalation factors and safety-critical barriers from real evidence.

  6. 6
    Review and publish

    Clear the checks, then print or export the diagram and the barrier register.

About this tool

A bow-tie diagram shows on one page how a major accident could happen and what stands in the way. In the middle is the top event, the moment control of a hazard is lost, such as loss of containment or a forklift out of control. To the left are the threats that could cause it, each with the preventive barriers meant to stop it. To the right are the consequences that could follow, each with mitigating or recovery barriers that limit the harm. The shape looks like a bow-tie, and its strength is that managers, operators and auditors can all read it without a risk-matrix lecture. This maker draws the diagram from a simple form. Every barrier gets an owner, a type such as passive hardware, active hardware or behavioural, an effectiveness rating and an escalation factor that could defeat it. Safety-critical barriers are flagged, the border colour shows effectiveness and you can tap any box in the drawing to jump to its fields. A register lists every barrier for audits and a set of review checks points out weak branches.

Building a good bow-tie

Start with the hazard: something with the potential to cause harm, described as it exists in normal operation, such as moving forklift trucks in shared areas or hydrocarbon under pressure. The top event is the first moment control is lost, not a consequence and not a failed barrier. Each threat should be a single, credible cause that could lead straight to the top event on its own. Each consequence is an outcome you want to avoid, such as a pedestrian struck or a racking collapse. Barriers sit in the order they would act along each line, and each should be able to stop the sequence on its own. A training course or a warning sign rarely does that alone, which is why the checks flag branches that rely only on behavioural barriers.

Barrier quality and escalation factors

For each barrier record who owns it, what type it is and how effective it is in practice. Rate it good, fair or poor from inspection results, audit findings or incident history, not from the procedure on paper. An escalation factor is a condition that can make a barrier fail, such as agency drivers starting before their authorisation is checked or shortcuts at shift change. Poor barriers without an escalation factor are flagged so the team records why they are weak. Mark barriers you rely on for major accident prevention as safety-critical; they appear with SC in the drawing. For detailed risk ranking of process deviations, the HAZOP worksheet builder on this site complements the bow-tie.

Worked example

The sample covers forklift operations in a warehouse. The hazard is moving forklift trucks in shared pedestrian areas and the top event is loss of control of a forklift near people. Three threats are drawn: an untrained driver, a pedestrian entering a working aisle and a brake or steering defect, with seven preventive barriers between them, including segregated walkways and LOLER thorough examination. Two consequences, a pedestrian struck and racking struck, have four mitigating barriers. Four barriers are marked safety-critical. Effectiveness counts are five good, five fair and one poor: the hi-vis and walkway rules, with the escalation factor of shortcuts at shift change. Every threat has at least two barriers and every barrier has an owner, so the review checks pass, and the drawing comes out 1106 by 456 units for printing.

Limits

A bow-tie is a visual summary of a risk assessment, not the assessment itself and not legal advice on your duties. It does not calculate frequencies or prove that risk is as low as reasonably practicable. Keep it alive by updating ratings after audits, incidents and changes.

Worked example

Forklift sample: 3 threats with 7 preventive barriers, 2 consequences with 4 mitigating barriers; 4 safety-critical; effectiveness 5 good, 5 fair, 1 poor.

Quick facts

Frequently asked questions

What is a top event in a bow-tie?

It is the moment control over the hazard is lost, before any harm is done, such as loss of containment of a flammable liquid. Threats lead into it from the left and consequences follow from it on the right.

What is the difference between preventive and mitigating barriers?

Preventive barriers sit on the left and stop a threat from causing the top event. Mitigating, or recovery, barriers sit on the right and limit the harm once the top event has happened, such as emergency response or bunding.

How many barriers should each threat have?

There is no fixed rule, but many companies expect at least two independent barriers on each threat line. The checks warn when a threat has fewer than two or relies only on procedures and training.

Can I export the diagram?

Yes. Download it as SVG for editing in drawing software, as PNG for slides, or print it with the barrier register and save the result as PDF.

Can I import a barrier list from a spreadsheet?

Export the register CSV to see the columns: side, branch, barrier, owner, type, effectiveness, escalation factor and critical. Edit the file and import it to rebuild the threats and consequences.

Is my risk data uploaded?

No. The diagrams are saved in this browser. Export the project file to keep a copy or share it with colleagues.