Boundary Wall Cost Estimator

Enter each wall segment's type, length, height, foundation and pillar spacing, add gates, and get bricks, cement, sand, steel, labour and a total.

Runs in your browser. Your files never leave your device. See how to check

…

How to do it

  1. 1
    List the segments

    Add one row per stretch of wall with its type, length and height.

  2. 2
    Set foundation and pillars

    Enter foundation depth and width, footing masonry width, pillar spacing and pillar size for each segment.

  3. 3
    Add gates

    List each gate with its width, height and count; put the gate segment first.

  4. 4
    Adjust mixes and rates

    Check the mortar, plaster and concrete mixes under Mixes and factors and type local prices on the Prices tab.

  5. 5
    Check the drawing

    Open the Drawing tab and pick a segment to see its pillars, fence and foundation.

  6. 6
    Print or export

    Print the materials list with segment quantities, or download the CSV for your builder.

About this tool

A boundary wall looks simple, but its cost depends on many choices: the wall material, its height, how deep the foundation goes, how often the pillars are placed, whether one or both faces are plastered and how wide the gates are. A plot often mixes types, for example a decorative front with a low wall and grille, solid brick on the sides and cheaper precast panels at the back. This estimator lets you enter each stretch as its own segment and prices the whole boundary together. For brick and block segments the tool works out the excavation, a lean concrete bed, the footing courses up to ground level, the wall itself between pillars, the reinforced concrete pillars and the plaster on each face. Precast segments are counted as posts set in concrete pits with slotted panels between them. A fence-on-wall segment adds a fence area above the low wall. Gates are taken out of the first segment's length and priced by area. The Drawing tab shows an elevation of any segment with its pillars, the fence above and the foundation below ground.

The quantities behind the estimate

Brickwork uses about 500 modular bricks per cubic metre including joints, and mortar fills roughly a quarter of the volume. Blockwork is counted per square metre of wall face. Mortar and plaster are turned into dry materials with a factor of 1.33 for mortar and 1.27 for plaster, then split by the cement to sand ratio; concrete uses a dry factor of 1.54. Cement bags assume 50 kg at a bulk density of 1,440 kg per cubic metre. Pillar steel is a simple kilograms per cubic metre allowance. Every factor sits under Mixes and factors so you can match your engineer's or supplier's figures.

Choosing pillar spacing and foundation

Pillars at about 3 metres are common for brick walls up to 2 metres high; taller walls, soft soil or wind exposure need closer spacing, deeper footings or a designed retaining structure. The tool does not check stability, so ask a structural engineer for walls over about 2 metres, walls that retain earth and sites with poor soil.

Limits

This is a cost estimate, not a structural design or a tender document. It does not include site clearing, surveying, demolition of an old wall, drainage weep holes, painting or electrical work for gate lights. Local rules on wall height, setbacks and permits are not checked.

Worked example

A 30 by 40 metre plot with 140 metres of boundary: a 30 metre front with a 1.2 metre wall and 0.6 metre fence, a 40 metre brick side, a 40 metre side in 200 mm blocks and a 30 metre precast rear, all 1.8 metres high, with a 4 metre main gate and a 1 metre wicket gate. The tool finds 56 pillars and posts, about 59.6 cubic metres of excavation, 25,316 bricks, 864 blocks, 90 precast panels on 16 posts, 215 cement bags, 28.9 cubic metres of sand and 551 kg of steel. At the sample rupee rates the materials come to about 617,500, labour to 220,000 and the total with 5 percent contingency and 10 percent overhead to about 967,300.

Quick facts

Frequently asked questions

How many bricks are there in a cubic metre of wall?

With modular bricks of about 190 by 90 by 90 mm and 10 mm joints it is close to 500. Traditional larger bricks give fewer, around 450; change the factor if your bricks differ.

Is a precast wall cheaper than brick?

Usually per metre, because panels and posts are factory made and go up quickly. Compare both types in the same estimate by switching a segment's type and saving each version as a scenario.

What foundation depth should I use?

Many small walls use 0.6 to 1 metre in firm soil, with the footing about two to three times the wall thickness wide. Clay, filled ground or tall walls need an engineer's design.

Why are gates taken from the first segment?

A gate opening has no wall, foundation or plaster. Put the segment with the gate first so its length is reduced by the total gate width.

Can I plaster only the outside face?

Yes. Set Plastered faces to 1 for that segment, or 0 for exposed brick. Pillars are plastered on all four sides whenever the segment has any plaster.

Does the tool keep my data on a server?

No. Calculations happen on your device, and saved scenarios live in your browser's storage only.