Capacity Planning for Small Teams: Who Has Time for What
How to plan team workload: set realistic capacity, assign projects by week, handle time off, read utilisation and spot overloads before deadlines slip.

Capacity Planning for Small Teams: Who Has Time for What
When a small team runs several projects at once, the same question comes up every week: who has time for this? Without a shared view, some people are overloaded while others wait for work, and deadlines slip quietly. Capacity planning makes the answer visible. This guide explains the basics, and you can build a plan with the free workload and capacity planner.
Capacity: what is realistic?
Capacity is the number of hours a person can spend on planned project work in a week. It is less than contracted hours:
- meetings, email and admin often take 15–30 % of a week,
- support requests and interruptions are unpredictable,
- people need time to learn and to think.
A common rule of thumb is to plan 30 to 35 hours of project work for a 40-hour week. Part-time staff get their real hours, reduced the same way.
Utilisation
Utilisation = planned hours ÷ available hours.
| Utilisation | Meaning |
|---|---|
| under 70 % | room for more work |
| 70–90 % | healthy |
| 90–100 % | full; no slack for surprises |
| over 100 % | overloaded; something will slip |
Sustained utilisation near 100 % is risky: queueing theory shows that waiting times rise sharply as a system approaches full capacity, which is why fully booked teams see small delays become long ones.
Planning by week
Plan in weeks rather than days. Daily plans change too often; monthly plans hide crunch weeks. For each person, list the projects they work on and estimate hours per week. Projects often ramp up and down, so the hours should change over time.
Time off and holidays
Mark leave, public holidays and training days. A person on leave has zero capacity that week, so any work planned for them shows as a conflict to resolve early, by moving work or bringing in help.
Reading the grid
A grid of people by weeks, coloured by utilisation, shows at a glance:
- red cells: overload to fix now,
- green cells: spare capacity to offer,
- red columns: a crunch week for the whole team, maybe a deadline to renegotiate.
Fixing overloads
- Move work to someone with spare capacity and the right skills.
- Push lower-priority work to a later week.
- Reduce scope.
- Add temporary help.
- As a last resort, agree on short-term overtime, and plan recovery time afterwards.
Keep it current
A capacity plan is only useful if it is updated. Review it in a short weekly meeting, adjust for new work and changes, and share the latest version as a spreadsheet.
Example
Aisha has 40 hours of capacity. In week 1 she has 30 hours on a website and 10 on an app: 100 %, full. Ben's leave in week 4 turns his 40 planned hours into an overload, so his work is moved to Chen, who has spare capacity.
Estimating hours
Estimates do not need to be precise, but they should be honest. Ask the person doing the work, break large tasks into smaller pieces, and compare with similar past projects. Add a buffer for unknowns, especially for new kinds of work. When actual effort turns out different, update the plan rather than silently absorbing the difference.
Skills, not just hours
Capacity is not interchangeable. A free designer cannot always help an overloaded developer. Note key skills next to people and check that each critical skill has more than one person who can cover it, so holidays and illness do not stop a project.
Share the plan openly
A plan everyone can see builds trust and makes trade-offs easier to discuss.
Limits
Planning hours are estimates. Capacity planning does not replace conversations with the team about workload and wellbeing.



&c=%23991b1b&k=business)