Small Business

Chasing Supply Requisitions: Classes of Supply and Follow-Up

The ten classes of supply, tracking requisitions from raised to received, a worked example with late and short deliveries, and common mistakes.

Saizul Amin
Saizul Amin3 Nov 2026 · 3 min read
Chasing Supply Requisitions: Classes of Supply and Follow-Up

Chasing Supply Requisitions: Classes of Supply and Follow-Up

Raising a requisition is the easy part. The hard part is knowing, a week later, which demands are moving, which have stalled and which arrived short. A simple tracking habit catches most problems before they become a vehicle off the road or a section without gloves.

The classes of supply

NATO and US forces group materiel into ten classes, and many cadet, reserve and civilian logistics teams borrow the same scheme:

  • I Subsistence: food and water.
  • II Clothing, individual equipment, tools and administrative supplies.
  • III Petroleum, oils and lubricants.
  • IV Construction and barrier materials.
  • V Ammunition.
  • VI Personal demand items.
  • VII Major end items such as vehicles and generators.
  • VIII Medical materiel.
  • IX Repair parts.
  • X Material for non-military programmes.

Grouping by class helps because each class often has its own supply chain, lead times and approval rules. If every late item is Class IX, the problem is probably repair parts, not your paperwork.

What to record

For each requisition keep the document number, date raised, class, item and stock or part number, quantity, priority, the date it is needed by, its status and the date that status last changed. When it arrives, record how many actually came.

Three flags worth watching

  • Late: still open and past the date it was needed.
  • Short received: closed as received, but fewer arrived than were ordered.
  • Follow up: open, and nothing has changed for a set number of days, say 7.

A single requisition can match more than one, so decide which matters most. Late usually beats short, and short beats a routine chase.

Worked example

Imagine three requisitions on your list today.

  1. An urgent fuel pump for a vehicle off the road, raised 20 days ago, needed 2 days ago. The status is Shipped, updated 3 days ago. It is late, and because it is urgent it heads the follow-up list. Ring the carrier for the tracking details rather than the supplier.
  2. Thirty pairs of cold weather gloves, routine, raised 12 days ago and needed in 20 days. Status On order, last updated 11 days ago. Not late, but 11 days without news is past a 7-day follow-up threshold, so ask for an expected delivery date.
  3. Ten 20-litre cans of engine oil, raised 30 days ago. Received 5 days ago, but only 8 arrived. Closed in the system, yet you are 2 cans short. Raise a discrepancy report or a new demand for the balance.

Count the open ones: two of three. Their ages are 20 and 12 days, so the average open age is 16 days. Watch that average over time; if it creeps upward, something in the chain is slowing down.

Common mistakes

  • Closing a requisition as received without counting what came.
  • Changing the status but not the date of the update, so stalled demands look fresh.
  • Leaving out the required-by date, which makes late items invisible.
  • Raising duplicates because nobody checked the list first.
  • Chasing every item every day instead of the late and stale ones.
  • Treating a personal tracker as the record of account.

The system of record

A spreadsheet or tracker helps you chase, but the unit's supply system is the record of account, and its priority rules and procedures decide what is demanded and authorised. This article is general guidance, not supply or procurement advice.

Using the Supply Class Requisition Tracker

The shobfree.com Supply Class Requisition Tracker keeps this list in your browser. Add each requisition with its class, priority and dates, move it across the status board as it progresses, and the tracker flags LATE, Short received and Follow up automatically, using the follow-up days you set. Counters show open, late and follow-up totals and the average open age, the summary groups demands by class, and a required-by list can be added to your calendar. Export the follow-up list as HTML before your logistics meeting. Load the example to see the three cases above.

Completely freeNo cost, no sign-up
Files stay privateEverything runs in your browser
Easy in your languageAvailable in many languages