How to Make a Shot List Your Crew Can Actually Use
Plan coverage for each scene: shot sizes, angles, movement, lenses, numbering like 12A and 12B, setups and realistic time estimates for the shooting day.

A shot list is the bridge between the script and the camera. The script says what happens; the shot list says how you will film it, one frame at a time. Directors who arrive with a clear list finish their days, and crews who receive it the night before arrive with the right lenses, track and lights. This guide covers what to put in a shot list and how to estimate whether it fits in the day.
Start from coverage, not from favourite shots
For each scene, ask what the editor will need. A typical dialogue scene gets a wide master that covers the whole action, then closer shots of each speaker, and inserts of details the audience must notice, such as a note on the table. Action scenes need shots that show geography, so the viewer understands where everyone is, before the close and fast shots. Write down the minimum coverage first; extras go at the end of the list in case the day runs well.
The fields that matter
Size describes how much of the subject is in frame: extreme wide, wide, medium wide, medium, medium close-up, close-up and extreme close-up, plus over-the-shoulder, point of view, two-shot and insert. Angle is where the camera sits relative to the eye line: eye level, high, low, overhead or tilted. Movement describes whether the camera is static or panning, tilting, on a dolly, a gimbal, a crane or handheld. The lens in millimetres tells the camera assistant what to prepare. A rough duration helps the editor and the producer, and the sound column flags shots that are silent, MOS, so the sound team can rest or record wild tracks.
Numbering
Shots are numbered after their scene: 12A, 12B, 12C. The letters I and O are usually skipped because on a slate they look like 1 and 0. The number goes on the slate, into the script supervisor's notes and into the editor's bins, so a consistent system saves hours in post-production. The Shot List Maker renumbers automatically whenever you drag a shot to a new position.
Setups and the clock
Time on set is spent moving the camera and relighting, not rolling. Every new camera position is a setup, and a small crew might need 20 to 45 minutes per setup depending on lighting. If you plan 18 setups and have 9 hours of shooting, at 30 minutes each you have no margin at all. Group shots that share a position and lens, shoot all of one direction before turning around, and the number of setups drops even if the number of shots stays the same.
Using references
A single reference frame often explains a shot better than a paragraph: a storyboard sketch, a photo from the location scout, or a still from a film with the mood you want. Attach it to the shot so the camera team sees exactly what you mean.
On the day
Keep the list on a phone or tablet and tick shots as they are done. When the day runs late, the remaining unticked shots show what you are losing, and you can make the decision with the producer rather than discovering it in the edit. Print a PDF for crew members who prefer paper; a laminated copy taped to the camera cart is an old trick that still works.
Limits
A shot list is a plan, not a promise. Actors find new blocking, the weather changes, and the best shot of the day is sometimes one nobody wrote down. Time estimates based on setups are rough guides. Use the list to protect the coverage the scene cannot live without, and stay open to the rest.



