How to Build a Risk Register and Read a 5x5 Risk Heat Map

Build a practical risk register: write clear risks, rate likelihood and impact, compare inherent and residual heat maps, assign owners and plan reviews.

Saizul Amin
Saizul Amin2 Nov 2026 · 3 min read
How to Build a Risk Register and Read a 5x5 Risk Heat Map

How to Build a Risk Register and Read a 5x5 Risk Heat Map

Every project and business carries risks, and most are known to someone on the team. A risk register writes them down, decides which matter most, gives each an owner and keeps them under review. A heat map turns the register into one picture that a sponsor can read in seconds. This guide explains how to build both, following the spirit of ISO 31000, with the free risk register and heat map.

Write risks clearly

A risk is an uncertain event that would affect your objectives. Write it as cause, event and effect: because one developer knows the payment code (cause), that person might leave mid-project (event), causing a delay of four to six weeks (effect). Vague entries such as "resources" or "technical issues" cannot be managed. A clear title, cause and effect make ownership and mitigation obvious.

Score likelihood and impact

Use a five-point scale for each. Likelihood: 1 rare, 2 unlikely, 3 possible, 4 likely, 5 almost certain. Impact: 1 insignificant, 2 minor, 3 moderate, 4 major, 5 severe. Multiply them for a score from 1 to 25. Common bands are low (1 to 4), medium (5 to 9), high (10 to 16) and critical (20 to 25). Agree what the impact levels mean for your project, for example a delay of more than a month or a cost overrun above 10 %, so different people score consistently.

Inherent and residual risk

Score each risk twice. Inherent risk is the level before new controls. Residual risk is the level you expect after your mitigations work. The difference shows the value of the mitigation plan. If a high inherent risk stays high after mitigation, it needs a different response or explicit acceptance by someone with authority.

Choose a response

There are four classic responses. Reduce lowers likelihood or impact, for example by pair programming and handover notes. Avoid changes the plan so the risk cannot occur, such as dropping a fragile supplier. Transfer moves the consequence to someone else, often through insurance or a contract. Accept means you knowingly live with it, usually for low risks or when mitigation costs more than the impact.

Give every risk an owner and actions

An owner is the person who watches the risk and makes sure actions happen, not necessarily the person who does the work. Each mitigation action needs its own owner and due date. A register with no owners is a list of worries, not a management tool.

Read the heat map

The heat map places each open risk in a 5 by 5 grid by likelihood and impact, coloured from green to red. Clusters in the top-right corner need attention now. Comparing the inherent map with the residual map shows whether mitigations move risks towards the bottom-left. In the tool, each cell shows the risk reference numbers, and tapping a cell filters the register to those risks.

Review on a schedule

Risks change. Set a review date for each open risk, often monthly, and sooner for high ones. At each review ask: has the likelihood or impact changed, are actions on track, can the risk be closed? The register flags reviews that are overdue or due within a week. Closed risks stay in the register for history but leave the heat map.

Share it

Export the register as a spreadsheet for steering meetings, or print a report sorted by residual score. Total exposure, the sum of scores before and after mitigation, is a simple headline: falling from 50 to 29 tells a sponsor the plan is working.

Limits

A 5 by 5 matrix is an ordinal tool: a score of 12 is not exactly twice as bad as 6, and band limits are a convention. It does not replace quantitative analysis such as Monte Carlo simulation for large projects, nor legal, safety or financial compliance assessments that your sector may require.