Maintenance Shift Handover: What to Write and Say
How to hand over unfinished aircraft maintenance between shifts, what the written record must contain, a worked example and common handover failures.

Maintenance Shift Handover: What to Write and Say
Some of the most serious maintenance-related accidents began with a job that was split across two shifts. Fasteners removed on one shift were assumed to have been refitted on the next; a step marked as done had only been started. The aircraft looked complete. Shift handover is where knowledge most easily falls between people, and it is why FAA AC 120-72 and EASA Part-145 both give it so much attention.
What a handover must carry
For every job not finished by the end of the shift, the incoming team needs to know:
- Which aircraft and which job or task card.
- The status: in work, waiting for parts, waiting for inspection or complete.
- Exactly where the job was left: the last step actually completed.
- What is disturbed: panels open, circuit breakers pulled, controls disconnected, fluids drained.
- Hazards: aircraft on jacks, hydraulic or electrical power applied, fuel tanks open.
- Parts awaited, with part numbers, quantities and expected arrival.
- Who is handing over and who is taking over.
Write it, then say it
A written record without a conversation misses nuance; a conversation without a record is forgotten by mid-morning. The best practice is both: a short meeting at the aircraft or at the board, using the written sheet as the agenda, with the incoming technician reading back the stage of each job before signing. Ideally the two people meet face to face; a note left on a toolbox is not a handover.
Worked example
It is the end of the day shift on 3 November. Two jobs are still open.
Job 1, G-ABCD, task card 32-11 main wheel change.
- Status: awaiting inspection.
- Left at: wheel fitted, axle nut torqued, cotter pin not yet fitted.
- Aircraft: unserviceable.
- Hazards: aircraft on jacks.
- Handed over by J. Patel to S. Lee.
Job 2, G-EFGH, nose tyre replacement.
- Status: parts awaited.
- Parts: one 5.00-5 tyre, expected at 09:00.
- Aircraft: unserviceable.
- Handed over by J. Patel.
Look at how precise Job 1 is. "Wheel nearly done" would have let the night shift assume the cotter pin was in. Writing "cotter pin not yet fitted" makes the open step impossible to miss, and "awaiting inspection" tells the inspector what to look at. Job 2 has no taker yet, which is a prompt for the supervisor to assign it.
Handing over at the board
Many hangars run the handover at a whiteboard or screen, with the outgoing supervisor going job by job. Keep each job to a minute: tail, status, stage, hazards, parts and who owns it next. Anything that needs longer, such as a troubleshooting job with several theories still open, is better discussed at the aircraft with the next shift's technician present. Where a job is waiting for an independent inspection, name the inspector who will take it and say which steps they must look at, so the inspection is not done from memory of a conversation.
Common handover failures
- Writing the next step planned instead of the last step completed.
- Words like "nearly finished", "mostly done" or "just needs closing up".
- Forgetting to mention work done outside the task card, such as an extra panel removed for access.
- Handing over at the canteen instead of at the aircraft.
- No signature from the person taking over, so nobody owns the job.
- Rushing because the outgoing shift wants to go home: build handover time into the roster.
- Not updating the task card itself, so the handover sheet and the card disagree.
This guide covers good practice for training and is not safety or engineering advice. Your organisation's handover procedure and the task card remain the controlling records.
Using the Maintenance Shift Turnover Log
The shobfree.com Turnover Log gives each open job an entry with shift date, shift, tail, task card, status, where it was left, parts awaited, aircraft status, hazards and the two names. A board shows jobs by status for the briefing, counters show what is in work, waiting for parts or waiting for inspection, and the summary prints a turnover sheet per shift with signature lines for both sides. Load the example to see the two jobs described here.



