Building an Export Quotation: From Factory Cost to EXW, FOB and CIF
How to build an export price ladder under Incoterms 2020, with freight, port charges and insurance on 110 percent, plus a worked UK to UAE quote.

Building an Export Quotation: From Factory Cost to EXW, FOB and CIF
When an overseas buyer asks for a price, the first question is not how much but on what terms. A price at your factory gate and a price delivered to the buyer's port can differ by a fifth or more. This guide shows how to build each price from your costs and present them together, using the Export Price Quotation Builder.
The price ladder
Each Incoterm adds the costs the seller takes on:
| Term | What the seller pays for |
|---|---|
| EXW | Goods ready at the seller's premises |
| FCA | Plus delivery to the buyer's carrier, here inland freight to the port |
| FOB | Plus export clearance and port charges, goods on board |
| CFR | Plus sea freight to the destination port |
| CIF | Plus marine insurance to the destination port |
The builder starts from factory cost per unit and quantity, adds your margin to get the EXW total, then adds each cost in turn.
Insurance on 110 percent
Cargo insurance is usually written for the CIF value plus 10 percent. Because the premium is part of the CIF value it insures, the price is worked out as CFR divided by (1 - 1.1 x rate). At low rates the difference from simply adding a percentage is small, but it keeps the quotation consistent with how insurers calculate.
A worked example
A Leeds supplier quotes a Dubai buyer:
- 1,200 stainless steel utensil sets at £6.40 factory cost, HS 8215.99.
- 800 bamboo cutting boards at £3.10, HS 4419.19.
- Margin 18 percent. Inland freight £450, port charges £380, sea freight £1,650, insurance 0.3 percent.
- Exchange rate 1.27 US dollars to the pound.
Factory cost is £10,160, and with margin £11,988.80. Converted, the totals are:
| Term | Total (US$) |
|---|---|
| EXW | 15,225.78 |
| FCA | 15,797.28 |
| FOB Felixstowe | 16,279.88 |
| CFR Jebel Ali | 18,375.38 |
| CIF Jebel Ali | 18,436.22 |
Unit prices spread the extra costs by value, so a utensil set is US$9.59 EXW and US$11.61 CIF, and a board US$4.65 EXW and US$5.63 CIF. The quotation adds terms such as 30 percent advance and 70 percent against a copy of the bill of lading, a 35-day lead time and a note that destination duties are excluded.
Which terms to offer
Many exporters quote FOB and CIF side by side and let the buyer choose. EXW looks cheapest but leaves export clearance to a foreign buyer, which is often impractical. For containers handed over at an inland depot, FCA is usually more accurate than FOB, because FOB, CFR and CIF are designed for goods loaded on a vessel.
Common mistakes
- Adding insurance to FOB instead of CFR. Insurance covers the goods to destination, so it is calculated after freight.
- Quoting with old freight rates. Sea freight moves week to week. Set a short validity date and recheck before confirming an order.
- Forgetting the exchange rate risk. A quote in dollars from costs in pounds is exposed until payment arrives. Build a margin for movement or shorten validity.
- Mixing up risk and cost. Under CFR and CIF the seller pays freight, but risk passes to the buyer when the goods are on board at origin.
- Missing HS codes. Buyers need them to estimate import duty; check them with a customs broker.
Validity and revisions
Give every quotation a number and a valid-until date, and when a buyer asks for a change in quantity or terms, issue a revised quotation with a new number rather than editing the old one. Saved versions in the builder keep each revision with a note, so you can see what was offered on which date if the order is confirmed weeks later.
Output
Print the quotation, save a PDF, download a Word file or save versions in your browser. Your costs are not uploaded.
This guide explains common pricing practice; it is not legal, customs or trade finance advice, and the official Incoterms 2020 rules from the ICC are the reference for each term.