Sizing a Transformer: Demand Factor, kVA and Fault Current

How to turn a connected load into maximum demand and a standard transformer size, with full-load and fault current and load factor explained.

Saizul Amin
Saizul Amin30 Oct 2026 · 4 min read
Sizing a Transformer: Demand Factor, kVA and Fault Current

Sizing a Transformer: Demand Factor, kVA and Fault Current

When a new building or factory is planned, someone has to decide how big the transformer or generator must be. Adding up every nameplate gives a number that is far too large, because loads never all run at full power together. The Electrical Load and Transformer Sizing Calculator turns the connected load into a realistic maximum demand and a standard transformer size. Here is the method.

Connected load and maximum demand

The connected load is the sum of the rated powers of everything that can be switched on. Maximum demand is the highest load the site actually draws, usually measured as an average over 15 or 30 minutes.

Two factors link them:

  • Demand factor = maximum demand / connected load. For a group of office sockets, it may be 0.4-0.6. For process machines that run continuously, it may be 0.9.
  • Diversity factor = sum of the individual maximum demands / the combined maximum demand. It is at least 1, because separate loads peak at different times. Housing estates have large diversity; a single factory line has very little.

Maximum demand = connected load × demand factor / diversity factor.

From kW to kVA

Transformers are rated in kVA because their losses and heating depend on current, not on real power. Apparent power S = P / cosφ. A load of 320 kW at power factor 0.9 is 356 kVA; at 0.8, it would be 400 kVA. Improving power factor with capacitors is often cheaper than buying the next transformer size.

Allow for growth

Sites grow. A margin of 20-25 % is common in design briefs; it covers future equipment and uncertainty in the load estimate. 356 kVA × 1.2 = 427 kVA.

Pick a standard rating

Distribution transformers come in standard sizes: 250, 315, 400, 500, 630, 800, 1,000, 1,250, 1,600 kVA and so on. The next size above 427 kVA is 500 kVA, which will run at 71 % of rating at today's maximum demand. That is a comfortable figure: transformer efficiency peaks where load losses equal no-load losses, often around 40-60 % load, so a modest margin costs little in efficiency.

Full-load current

I = S / (√3 × U). For 500 kVA at 400 V, that is 722 A. This sets the rating of the main low-voltage switchboard and incoming cables or busbars.

Fault current

The transformer's impedance voltage uk, typically 4 % for small units and 6 % for 500 kVA and above, limits the current that flows in a short circuit at its terminals:

Isc ≈ I / uk = 722 / 0.06 ≈ 12 kA

The switchgear and breakers must be able to interrupt at least this current. The real value is a little lower, because the upstream network and the cables add impedance, but using the transformer alone is a safe first estimate. A larger transformer or one with a lower uk raises the fault level, which can force expensive switchgear upgrades.

Load factor

Once a site is running, the load factor shows how well it uses its capacity:

Load factor = energy used / (peak demand × hours)

A site that uses 36,000 kWh in a 720-hour month with a 120 kW peak has a load factor of 41.7 %. Its average demand is 50 kW, and its equivalent full-load hours are 300. Utilities often charge for peak demand separately, so a low load factor means paying for capacity that is rarely used. Shifting flexible loads such as water heating, charging or pumping away from the peak raises the load factor and cuts bills.

Common pitfalls

  • Using nameplate totals without demand factors, which leads to oversized transformers with higher no-load losses all year.
  • Forgetting motor starting: a large direct-on-line motor can draw six to eight times its running current, and the transformer must tolerate that dip.
  • Ignoring harmonics from drives and LED drivers, which may require a K-rated or derated transformer.
  • Underestimating future load in data rooms and EV charging, where demand grows quickly.

A full example

A connected load of 400 kW with a demand factor of 0.8, no extra diversity, power factor 0.9 and a 20 % growth margin gives:

  1. Maximum demand: 320 kW.
  2. Apparent power: 356 kVA.
  3. With growth: 427 kVA.
  4. Standard size: 500 kVA at 71 % loading.
  5. Full-load current at 400 V: 722 A.
  6. Fault current at uk 6 %: about 12 kA.

Summary

Good transformer sizing is a balance: large enough for maximum demand plus growth, small enough to avoid wasting no-load losses, and with a fault level the switchgear can handle. Try different demand factors and power factors in the transformer sizing calculator to see how sensitive the result is, then confirm it with measured data or your utility's design rules.