Construction Submittal Logs: Keeping Reviews Ahead of the Programme

How to log construction submittals by specification section, track review periods and resubmissions, and spot items that will hold up the site.

Saizul Amin
Saizul Amin7 Nov 2026 · 3 min read
Construction Submittal Logs: Keeping Reviews Ahead of the Programme

Construction Submittal Logs: Keeping Reviews Ahead of the Programme

Late materials rarely start with the supplier. More often the delay began weeks earlier, when a shop drawing sat with a reviewer, came back as revise and resubmit, and went round again. A submittal log keeps that cycle visible so the project team can chase reviews before they become a programme problem.

What counts as a submittal

Submittals are the documents and samples a contractor sends to the design team before ordering or installing: product data sheets, shop drawings, physical samples, calculations, test reports, warranties and operation and maintenance manuals. Each one belongs to a specification section, and each review ends with a status such as approved, approved as noted, revise and resubmit, or rejected.

The fields that matter

A useful log records the submittal number, the specification section, the item, the type, the supplier, the submission number (0 for the first, then 1, 2 and so on), the date sent, the date returned, the status and the date the item is needed on site. The last field is the one most logs leave out, and it is the one that tells you whether a slow review actually matters.

Worked example

The Construction Submittal Log sample has a 14-day review period and three submittals.

The concrete mix design C32/40 under section 03 30 00 was sent on 20 September and approved on 29 September, comfortably before the 5 October pour.

The window shop drawings under 08 52 00 are on submission 1. The first submission came back asking for a revised sill detail. The new set went on 27 October, so the review is due on 10 November, and the windows are needed on site by 30 November. That leaves under three weeks after the review for any final changes, ordering and delivery, which is tight for made-to-measure timber windows.

The lobby porcelain tile sample under 09 30 00 went on 1 November, with the review due on 15 November and the tiles not needed until mid January.

In early November the summary reads three submittals, two of them pending, no overdue reviews and one resubmission. If the window review slips past 10 November, the log flags it as OVERDUE. Once the site date is within two weeks and the review is still pending, the item is flagged site date at risk.

Working the log

Review the log weekly with the commercial and site teams. Sort by needed on site date rather than by number, so the urgent items come first. Chase reviewers a few days before the review due date, not after it. The due list exports to a calendar file, which makes the reminders automatic.

When a submittal comes back revise and resubmit, the insights panel lists it with the reviewer's comment. Pass that comment to the supplier the same day, and record the new submission number when it goes back.

Common mistakes

No site date. Without a needed-by date, every late review looks equally urgent, and the important ones get lost.

Starting too late. Long-lead items such as windows, lifts and structural steel need submittals early. Build the submittal dates into the programme.

Changing the number for each resubmission. Keep one submittal number and raise the submission number. Otherwise the history of an item is scattered across several lines.

Treating approved as noted as approved. The notes are conditions. Make sure the supplier has read them before fabrication.

Assuming the default period is contractual. The 14-day review period in the settings is only a starting point. Contracts and specifications often set different periods for different submittal types.

Keeping a record

The log stays in your browser, so export a CSV for Excel each week and keep a JSON backup. Approval of a submittal does not change anyone's contractual responsibilities; check your contract for what review and approval actually mean on your project.