Rating Hazards and Residual Risk: A Plain Guide to Risk Management
How to identify hazards, rate probability and severity on the standard matrix, choose controls that work and find the overall residual risk.

Rating Hazards and Residual Risk: A Plain Guide to Risk Management
Every training event carries risk. The aim of risk management is not to remove it but to understand it, reduce it where you can, and make sure the right person accepts what is left. The process is the same whether the event is a range, a road move or a sports day.
Step 1: identify the hazards
A hazard is a condition that could cause injury, illness, damage or mission failure. Walk through the event in order, from arrival to departure, and ask what could go wrong at each stage. Night movement, cold weather, vehicles near people, water, heat and fatigue are common examples. Describe each hazard as the harmful event, such as "soldier lost or separated", not just "darkness".
Step 2: rate probability and severity
Probability asks how likely the harm is: Unlikely, Seldom, Occasional, Likely or Frequent. Severity asks how bad it would be: Negligible, Marginal, Critical or Catastrophic. Rate the hazard as it stands, before any controls.
Step 3: read the matrix
The standard Army-style matrix combines the two into Low, Medium, High or Extremely high. Catastrophic hazards are never Low: they are Medium when Unlikely, High when Seldom or Occasional, and Extremely high when Likely or Frequent. Critical hazards run from Low when Unlikely to Extremely high when Frequent. Marginal hazards stay Low or Medium unless Frequent, and Negligible hazards are Low unless Frequent.
Step 4: choose controls
Controls are what you will actually do: buddy teams, rehearsals, cut-off times, speed limits, ground guides, protective equipment, medical cover. Most controls reduce probability. Fewer reduce severity, so be honest when rating. Name who will put each control in place.
Step 5: rate residual risk and decide
Rate the hazard again with the controls working. The highest residual level of any hazard is the overall risk for the event, and it decides who must approve it. Approval levels are set by your service and command; a common pattern places low risk with a company commander and higher levels with more senior commanders.
Step 6: supervise and review
The assessment is only as good as its execution. Brief the controls to the people who will apply them, check on the day that they are in place, and stop the activity if conditions change beyond what was assessed, such as a sudden drop in temperature or a missing safety vehicle. Afterwards, note which controls worked and which were impractical, so the next worksheet for the same event starts from experience rather than from scratch.
A worked example
A night land navigation course has four hazards:
- Falls on uneven ground: Likely and Marginal, Medium. With red-filter torches, buddy teams and a walk-through of the course: Seldom and Marginal, Low.
- Cold weather injury: Occasional and Marginal, Medium. With layering checks, a warm-up tent and hourly check-ins: Seldom and Marginal, Low.
- Soldier lost or separated: Occasional and Critical, High. With a lost-person drill, whistles, cut-off times and accountability at each point: Seldom and Critical, Medium.
- Vehicle movement near the start point: Seldom and Critical, Medium. With ground guides, a 10 km/h limit and a separate vehicle area: Unlikely and Critical, Low.
The overall residual risk is Medium, driven by the lost-soldier hazard. The worksheet goes to whoever your command names as the approval authority for medium risk.
Common mistakes
- Listing vague hazards such as "weather" with no harmful event attached.
- Writing controls nobody will actually carry out.
- Lowering severity because of controls that only reduce probability.
- Rating residual risk higher than initial risk through careless entry.
- Signing the worksheet and never briefing the controls to the people on the ground.
This guide explains a common method; it is not safety, legal or official advice. Follow your service's risk management regulation.
Using the composite risk management worksheet
The shobfree.com worksheet runs in your browser and nothing is uploaded. Enter the task, unit, date and preparer, then add each hazard with probability 1-5, severity 1-4, controls, residual ratings and who implements them. The preview shows initial and residual levels in colour and the overall residual risk. Edit the approval list for your chain, add the full matrix if you want it printed, and fix any check warnings. Save versions, then print for signature, save as PDF or download a Word file. It is a planning aid, not the official DD Form 2977.


