Running Unit Additional Duties So Inspections Hold No Surprises
How to keep every unit programme staffed, trained and inspection-ready: appointments, alternates, continuity binders and a simple status check.

Running Unit Additional Duties So Inspections Hold No Surprises
Every unit runs a long list of programmes on top of its real work. Safety, fire marshal, voting assistance, key control, physical security, equal opportunity, records management and many more each need someone appointed in writing. The trouble is not the programmes themselves but the churn: people post out, courses lapse, binders gather dust, and nobody notices until a staff assistance visit is on the calendar.
Build a register, not a pile of letters
The first step is one list of every programme the unit is required to run. For each one you want the programme name, the manager, an alternate, the date of appointment, whether the required training is done, the date of the next inspection or visit, and when the continuity binder was last updated. Signed letters in a drawer tell you who was appointed; a register tells you whether the programme is actually working.
Four questions for every programme
A quick status check catches most problems. Ask in order:
- Is there a manager at all?
- Has that manager completed the required training?
- Has the inspection date already passed?
- If all three are fine, the programme is ready.
Treat a booked course as not yet complete. People get pulled from courses, and an inspector will ask for the certificate, not the joining instructions.
Appoint an alternate every time
An alternate is the cheapest insurance a commander can buy. When the manager is on leave, deployed or posted, the alternate keeps the programme running and already knows where the binder is. Put the alternate in the appointment letter so their authority is clear.
Keep the continuity binder alive
The binder should hold the appointment letter, the governing references, training certificates, the last inspection report and the actions taken since. A binder that has not been touched for six months is a warning sign, even if the programme looks fine on paper. Make updating it part of the monthly routine.
A worked example
Take three programmes in B Company.
- Unit safety officer: Lt Fox, with Sgt Hill as alternate, appointed 1 July, training done, next inspection 5 December, binder updated in September. Ready.
- Unit voting assistance officer: no one appointed, training not done, inspection in February. No manager.
- Fire marshal: Cpl Adams, training booked, inspection on 20 November, binder last updated in March.
The register shows one programme without a manager, two still needing training, and one binder more than six months old. The fire marshal inspection is about two weeks away, so the priority is clear: confirm the course date, bring the binder up to date and walk the fire checklist. The voting assistance appointment needs a name before February, along with an alternate.
Write the checklist into the appointment
The best appointment letter includes the inspection checklist for that programme. The new appointee then knows from day one what an inspector will look for, rather than discovering it the week before.
Review the register monthly
Put the register on the agenda of a monthly command meeting. Five minutes is enough to read the gaps aloud, confirm course dates, note who is posting out in the next quarter and name replacements before the vacancy opens.
Common mistakes
- Appointing the same person to six programmes, so one posting empties half the register.
- Treating a booked course as completed training.
- Leaving inspection dates blank, which makes every programme look ready.
- Forgetting to reissue letters when the commander changes, if your service requires it.
- Never checking the binder until the visit is announced.
This is general organising guidance, not legal or regulatory advice; your service and command decide which programmes you run and how appointments are made.
Using the additional duty manager
The shobfree.com Additional Duty and Unit Programme Manager runs in your browser, and nothing is uploaded. Enter the unit and appointing commander in Settings, then add each programme with its manager, alternate, appointment date, training state, next inspection, binder date and checklist. Each line shows Ready, No manager, Training needed or Inspection overdue, and the totals show gaps across the unit and binders older than six months. Print an appointment memorandum for any programme with its checklist attached, and export inspection dates from the Inspections tab as a calendar file. CSV export and JSON backup keep the register safe.


