Money and Finance

Activity-Based Costing Calculator: Find True Product Cost

Work out activity rates from cost pools and drivers and see how activity-based costing changes unit costs compared with labour-hour costing.

Saizul Amin
Saizul Amin7 Nov 2026 · 4 min read
Activity-Based Costing Calculator: Find True Product Cost

Plenty of small manufacturers price their products using a cost that is quietly wrong. The direct materials and labour are right, but the overhead, which can be half the total, is spread by labour hours as if every product made the same demands on the factory. The free Activity-Based Costing Calculator shows what happens when you trace overhead to the activities that really cause it.

Everything is calculated in the page; no figures are sent to a server.

Two ways to assign overhead

MethodHow overhead is charged
TraditionalOne rate: total overhead / total direct labour hours, charged by each product's labour hours
Activity-basedA rate per activity: cost pool / driver quantity, charged by each product's use of that driver

How to use the calculator

  1. Set the direct labour rate per hour.
  2. Add up to five activities, labelled A1 to A5. For each, enter the cost pool, the cost driver and the total driver quantity for the period.
  3. Add your products with the units made, material cost per unit and labour hours per unit.
  4. Enter driver use. In columns u1 to u5, record how much of each driver the product used in total, matching A1 to A5.
  5. Read the results: activity rates, product costs under both methods, the difference per unit and a comparison chart.
  6. Check the note to confirm ABC assigned the whole overhead, then print the report.

A worked example

The default is a small workshop making two brackets, with labour at 18 an hour and four overhead pools totalling 280,000.

ActivityPoolDriverQuantityRate
Machine setups60,000setups200300 per setup
Machining150,000machine hours10,00015 per hour
Quality inspection40,000inspections80050 per inspection
Order handling30,000orders1,50020 per order

The standard bracket is made in a long run of 20,000 units, with 4 of material and a quarter of a labour hour each. The custom bracket is a batch of 2,000 units, with 9 of material and 0.6 labour hours each, but it needs 160 of the 200 setups, 600 of the 800 inspections and 1,000 of the 1,500 orders.

Total labour hours are 6,200, so the traditional rate is 280,000 divided by 6,200, or 45.16 per labour hour. The standard bracket, with most of the hours, absorbs most of the overhead.

Under ABC the standard bracket costs 14.60 a unit, against 19.79 traditionally. The custom bracket costs 98.80 a unit under ABC, against 46.90 traditionally. In other words, traditional costing overstates the simple product's cost by about 5 a unit and understates the complex product's cost by more than half. All 280,000 of overhead is assigned under both methods; it is simply distributed very differently.

Why the gap is so large

The custom bracket uses few labour hours in total, 1,200, so a labour-hour rate barely touches it. But it drives most of the setups, inspections and orders. Every one of those costs money whether a batch has 10 units or 10,000. Activity-based costing charges the custom bracket for that work, and the simple product stops subsidising it.

What to do with the results

If you have been quoting the custom bracket on a cost of about 47, you have probably been losing money on every order. You might raise its price, set a minimum order size, combine orders to cut setups, or redesign it to need fewer inspections. Meanwhile, the standard bracket may be overpriced against competitors who cost more accurately.

Choosing activities and drivers

Start with the three to five activities that make up most of your overhead and that products use in very different amounts. A good driver is countable and moves with the cost: setups, machine hours, inspections, purchase orders, deliveries or customer calls. Do not chase precision with dozens of activities; the first few capture most of the insight.

Checking the totals

For each activity, the driver use across products should add up to the total quantity you entered. If it does not, ABC will assign more or less overhead than the pools, and the note explains the gap. A shortfall may also signal unused capacity, which is a cost worth managing on its own rather than loading onto products.

Limits

This is a learning and planning aid, not accounting advice. Results depend on the pools and driver counts you enter, so test them against your own records before changing prices.

Frequently asked questions

What is a cost pool?

The total overhead cost of one activity for the period, such as all the costs of machine setups.

Does ABC replace my financial accounts?

No. It is a management tool for pricing and decisions. Your statutory accounts follow their own rules.

Can I model services instead of products?

Yes. Use activities such as client calls or reports, and enter zero for materials if none apply.

What if I have more than five activities?

Combine smaller activities with similar drivers, or run two calculations.

What does the labour rate comparison show?

It reruns the costing with labour at 22 an hour, so you can see how wage changes affect each product.

Final thoughts

The Activity-Based Costing Calculator shows which products really earn their keep. Trace overhead to the work that causes it, compare the results with your current costs, and price with confidence.