A3 Problem Solving: How to Fill In Each Box of an A3

How the lean A3 report follows PDCA on one sheet, what belongs in each of the seven boxes, and a worked changeover example with common A3 mistakes.

Saizul Amin
Saizul Amin7 Nov 2026 · 4 min read
A3 Problem Solving: How to Fill In Each Box of an A3

A3 Problem Solving: How to Fill In Each Box of an A3

The A3 report takes its name from a sheet of paper, 297 by 420 mm. At Toyota it became the standard way to think through and share a problem, because a single sheet forces the writer to choose what matters. The format is simple to copy and hard to do well, which is why lean coaches spend so much time asking questions about each box.

How the sheet is organised

An A3 follows plan, do, check, act. The left half is the plan: background, current state, goal and root cause analysis. The right half is do and check: countermeasures, an implementation plan and follow-up. The left side should take most of the effort. Teams that jump to the right side tend to put in the solution they had in mind before they looked.

Worked example

The A3 problem solving report opens with a sample from a press shop. The theme is to reduce changeover time on press 4.

1. Background. Press 4 makes nine different parts. Changeovers take 95 minutes, so the plant runs large batches and holds a lot of stock.

2. Current state. The figures come from watching ten changeovers: 95 minutes on average, 3.5 changeovers a week and 11 days of finished stock for press 4 parts. A quick sum shows the size of the prize: 3.5 times 95 minutes is about 5.5 hours of press time a week.

3. Goal. A changeover under 30 minutes by the end of March.

4. Root cause analysis. Three causes were found by watching the work. Dies have different heights, so shims are fitted every time. Tools are fetched from stores while the press waits. Setters each work in their own order.

5. Countermeasures. Each cause gets a response: fixed spacers to standardise die heights, a changeover cart prepared before the press stops, and a standard work sheet with training.

6. Plan. The tool room makes the spacers in December week 2, maintenance builds the cart in week 3 and the owner writes the standard work and trains setters in January week 2.

7. Follow-up. Every changeover is timed for four weeks, and results go to the monthly operations meeting.

The page prints in landscape on A3, on 11 by 17 inch tabloid paper for US offices, or on A4 when no large printer is available. If you delete the numbers from the current state box, a warning reminds you that an A3 should show facts and data.

Reading the example critically

Notice how the countermeasures line up with the causes. The die height problem gets spacers, the tool fetching gets a cart and the inconsistent method gets standard work. A good coach would check that the link holds in the other direction too: is there any countermeasure that does not answer a cause? If so, it is probably a favourite idea rather than a response to the analysis.

The goal is also worth questioning. Under 30 minutes is a big step from 95. That can be right for a changeover project, because moving work outside the stop often halves the time, but the A3 should say how the team arrived at the figure.

Common mistakes

A current state with no numbers. Changeovers take too long is an opinion. 95 minutes over ten observations is a fact others can check.

Solutions in the background box. The background explains why the problem matters to the business. It should not already say what the fix will be.

Root causes that are really symptoms. Long changeover is the problem, not the cause. Keep asking why until you reach something you can change.

Countermeasures without owners. The plan box needs a who and a when for each action. Without them the A3 stays a discussion document.

Never filling in the follow-up. The check step is what makes an A3 a learning tool. Record the measured result, even if it falls short of the goal, and decide the next step.

Keeping A3s useful

Save a version of the A3 each time you review it with your coach. Comparing early and later versions shows how the team's understanding changed, which is often the most valuable part of the exercise.

Completely freeNo cost, no sign-up
Files stay privateEverything runs in your browser
Easy in your languageAvailable in many languages