5S Audit Checklist and Score Tracker
Pick the area and auditor, score two questions for each of the five S pillars from 0 to 5, attach photos and write findings, and the tracker turns each audit into a percentage score with pillar averages, shows the weakest pillar, compares areas and charts how every area improves from one audit to the next.
Runs in your browser. Your files never leave your device. See how to check
…
How to do it
- 1Settings
Enter the site and the target score.
- 2Start
Choose the date, area and auditor.
- 3Score
Rate the ten questions from 0 to 5.
- 4Evidence
Add photos and write the findings.
- 5Review
Print the sheet and check the trend.
About this tool
The 5S Audit Checklist and Score Tracker records workplace organisation audits on the five pillars used in lean programmes: Sort, Set in order, Shine, Standardise and Sustain. Each audit is one entry with its date, the area, the auditor and ten questions, two for each pillar. Sort asks whether only items needed for current work are present and whether unneeded items are red-tagged and removed. Set in order asks whether every item has a marked, labelled place and whether walkways, exits and safety equipment are marked and clear. Shine covers clean floors, machines and benches, and whether cleaning includes checking for leaks, wear and damage. Standardise checks that standards and checklists are posted and current and that visual controls show normal and abnormal at a glance. Sustain asks whether audits run on schedule with actions closed and whether people follow the standards without being reminded. Every question is scored on a 0 to 5 rating, where 0 means not started and 5 means the practice is fully in place, and each starts at 3 so the auditor adjusts up or down. The tracker averages the two answers into a pillar score from 0 to 5, adds the five pillars and divides by the maximum of 25 to give a percentage. Photos taken on a phone or loaded from a computer are shrunk and attached to the audit, and a findings box records what was seen and what must be done. Settings hold the site name and the target score, 80 percent unless you change it. The area list covers Assembly, Welding, Stores, Office, Maintenance and Packing.
Who this is for
Lean and continuous improvement coordinators running a monthly 5S round, production and warehouse supervisors who audit their own areas, office managers bringing 5S to shared spaces, and safety teams who want a record that ties housekeeping to clear walkways and exits.
How to use it
1. Set the site name and the target score in the settings. 2. Start an audit with the date, area and auditor. 3. Score the ten questions from 0 to 5 as you walk the area. 4. Add photos of problems and good practice, then write the findings. 5. Save, print the audit sheet and compare it with earlier audits.
Scores, charts and summaries
Above the table you see the number of audits, the average score, how many audits fell below target and the area with the best average. A note names the weakest pillar in the audit with the latest date, so the next action is clear. The first chart plots the 5S percentage for each audit with a separate line per area, and the second shows the five pillar scores of every audit as bars. The By area summary lists audits, average percentage and latest percentage for each area. Every audit prints as an audit sheet with all ten questions, the score against target, the findings and the attached photos.
What the sample shows
Three audits are loaded. Assembly on 15 September scored 50 percent, with red tags and cleaning checks at 2 and old fixtures found under bench 4. A month later, after shadow boards and a posted cleaning checklist, Assembly reached 70 percent. Stores on 16 October scored 44 percent, with obsolete stock on racks 7 to 9 and worn aisle markings. The average is 55 percent, all three audits are below the 80 percent target, Assembly is the best area, and the weakest pillar in the Stores audit is Standardise at 1.5 of 5.
Keeping records
Several named logs can be kept, for example one per site or per year. Search and date filters narrow the table, and stats and charts follow the filter. The table exports to CSV, the full log prints as a report with charts and summaries, and Backup (JSON) saves entries together with their photos. Everything is stored in this browser on this device, so make a backup before clearing browser data.
Limits
The score reflects the auditor's own judgement on each question; two auditors can give the same area different scores, so agree what a 3 and a 5 look like before comparing areas. The questions and area list are fixed in this version, with notes available for anything else. Photos are reduced in size to save space. A 5S score is a housekeeping measure; it is not safety or legal advice and does not replace a formal risk assessment.
Worked example
Sample: Assembly 50% (15 Sep) then 70% (15 Oct); Stores 44%; average 55%, all below the 80% target; weakest pillar in Stores is Standardise at 1.5 of 5.
Quick facts
- Category: Business & Work
- Works in your browser, no sign-up, no upload.
- Your input stays on your device.
- Available in English.
- Content last reviewed:
- Official source: Lean 5S (sort, set in order, shine, standardise, sustain) audit practice
Frequently asked questions
How is the 5S percentage worked out?
Each pillar is the average of its two questions on a 0 to 5 scale. The five pillar scores are added and divided by 25, then shown as a percentage, so 12.5 points gives 50 percent.
Can I change the target score?
Yes. Open the settings and enter any target percentage. The Below target count and the target shown on each audit sheet use the new value.
How do I compare areas over time?
The score chart draws one line per area across its audits, and the By area summary shows each area's average and latest score side by side.
Can I attach photos to an audit?
Yes. Add photos from a phone camera or a file. They are shrunk, stored in this browser and printed on the audit sheet with the findings.
What does the weakest pillar note use?
It looks at the audit with the latest date and names the pillar with the lowest average, so the team knows which S to work on before the next round.
Can I move my audits to another device?
Use Backup (JSON), which includes the photos, and import the file on the other device. A CSV export is also available for spreadsheets.